An evaluation of total project risk based on fuzzy logic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26510%2F16%3APU117111" target="_blank" >RIV/00216305:26510/16:PU117111 - isvavai.cz</a>
Výsledek na webu
<a href="https://journals.vgtu.lt/index.php/BTP/article/view/8201" target="_blank" >https://journals.vgtu.lt/index.php/BTP/article/view/8201</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3846/btp.2016.534" target="_blank" >10.3846/btp.2016.534</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
An evaluation of total project risk based on fuzzy logic
Popis výsledku v původním jazyce
The article deals with the use of fuzzy logic as a support of evaluation of total project risk. A brief description of actual project risk management, fuzzy set theory, fuzzy logic and the process of calculation is given. The major goal of this paper is to present am new expert decision-making fuzzy model for evaluating total project risk. This fuzzy model based on RIPRAN method. RIPRAN (RIsk PRoject ANalysis) method is an empirical method for the analysis of project risks. The Fuzzy Logic Toolbox in MATLAB software was used to create the decision-making fuzzy model. The advantage of the fuzzy model is the ability to transform the input variables The Number of Sub-Risks (NSR) and The Total Value of Sub-Risks (TVSR) to linguistic variables, as well as linguistic evaluation of the Total Value of Project Risk (TVPR) – output variable. With this approach it is possible to simulate the risk value and uncertainty that are always associated with real projects. The scheme of the model, rule block, attributes and their membership functions are mentioned in a case study. The use of fuzzy logic is a particular advantage in decision-making processes where description by algorithms is extremely difficult and criteria are multiplied.
Název v anglickém jazyce
An evaluation of total project risk based on fuzzy logic
Popis výsledku anglicky
The article deals with the use of fuzzy logic as a support of evaluation of total project risk. A brief description of actual project risk management, fuzzy set theory, fuzzy logic and the process of calculation is given. The major goal of this paper is to present am new expert decision-making fuzzy model for evaluating total project risk. This fuzzy model based on RIPRAN method. RIPRAN (RIsk PRoject ANalysis) method is an empirical method for the analysis of project risks. The Fuzzy Logic Toolbox in MATLAB software was used to create the decision-making fuzzy model. The advantage of the fuzzy model is the ability to transform the input variables The Number of Sub-Risks (NSR) and The Total Value of Sub-Risks (TVSR) to linguistic variables, as well as linguistic evaluation of the Total Value of Project Risk (TVPR) – output variable. With this approach it is possible to simulate the risk value and uncertainty that are always associated with real projects. The scheme of the model, rule block, attributes and their membership functions are mentioned in a case study. The use of fuzzy logic is a particular advantage in decision-making processes where description by algorithms is extremely difficult and criteria are multiplied.
Klasifikace
Druh
J<sub>SC</sub> - Článek v periodiku v databázi SCOPUS
CEP obor
—
OECD FORD obor
50602 - Public administration
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Business: Theory and Practice
ISSN
1648-0627
e-ISSN
—
Svazek periodika
17
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
LT - Litevská republika
Počet stran výsledku
9
Strana od-do
23-31
Kód UT WoS článku
—
EID výsledku v databázi Scopus
2-s2.0-84959362063