Large-scale tests performed in support of LBB projects applied to WWER type NPPS in the Czech Republic in years 1992-1994

Identifikátory výsledku

Alternativní jazyky

  • Jazyk výsledku

    angličtina

  • Název v původním jazyce

    Large-scale tests performed in support of LBB projects applied to WWER type NPPS in the Czech Republic in years 1992-1994

  • Popis výsledku v původním jazyce

    In the paper, an overview of large-scale experiments performed on components of WWER primary circuits within several LBB projects conducted in the Czech Republic in years 1992-1994 is presented. The tested components were replicas of the real ones; theycontained a through-wall crack and were loaded by pressure and bending moment in two stages, as appropriate according to the LBB methodology. All tested components exhibited stable behaviour under normal operating loading superposed with safe shutdown earthquake loading (NOC + SSE) applied during 1st stage of experiment. During 2nd stage of experiment, under loading by bending moment only, the models usually exhibited stable tearing of the crack, in some cases limit load (maximum force at loading controlled by displacement) was reached. In the paper, the experiments are briefly described, with presenting the main experimental and (in some cases) FE computational results.

  • Název v anglickém jazyce

    Large-scale tests performed in support of LBB projects applied to WWER type NPPS in the Czech Republic in years 1992-1994

  • Popis výsledku anglicky

    In the paper, an overview of large-scale experiments performed on components of WWER primary circuits within several LBB projects conducted in the Czech Republic in years 1992-1994 is presented. The tested components were replicas of the real ones; theycontained a through-wall crack and were loaded by pressure and bending moment in two stages, as appropriate according to the LBB methodology. All tested components exhibited stable behaviour under normal operating loading superposed with safe shutdown earthquake loading (NOC + SSE) applied during 1st stage of experiment. During 2nd stage of experiment, under loading by bending moment only, the models usually exhibited stable tearing of the crack, in some cases limit load (maximum force at loading controlled by displacement) was reached. In the paper, the experiments are briefly described, with presenting the main experimental and (in some cases) FE computational results.

Klasifikace

  • Druh

    D - Stať ve sborníku

  • CEP obor

    JF - Jaderná energetika

  • OECD FORD obor

Návaznosti výsledku

  • Projekt

  • Návaznosti

    N - Vyzkumna aktivita podporovana z neverejnych zdroju

Ostatní

  • Rok uplatnění

    2010

  • Kód důvěrnosti údajů

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Údaje specifické pro druh výsledku

  • Název statě ve sborníku

    Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP, 3

  • ISBN

    9780791843666

  • ISSN

    0277-027X

  • e-ISSN

  • Počet stran výsledku

    9

  • Strana od-do

    321-329

  • Název nakladatele

    ASME

  • Místo vydání

  • Místo konání akce

    Praha

  • Datum konání akce

    1. 1. 2009

  • Typ akce podle státní příslušnosti

    WRD - Celosvětová akce

  • Kód UT WoS článku

Základní informace

Druh výsledku

D - Stať ve sborníku

D

CEP

JF - Jaderná energetika

Rok uplatnění

2010