Economic Evaluation of Battery Energy Storage Integration into Plant with Cyclic Load
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23220%2F22%3A43966063" target="_blank" >RIV/49777513:23220/22:43966063 - isvavai.cz</a>
Výsledek na webu
<a href="https://ieeexplore.ieee.org/document/9919891" target="_blank" >https://ieeexplore.ieee.org/document/9919891</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/AE54730.2022.9919891" target="_blank" >10.1109/AE54730.2022.9919891</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Economic Evaluation of Battery Energy Storage Integration into Plant with Cyclic Load
Popis výsledku v původním jazyce
This paper deals with the simplified economic evaluation of the peak shaving by a battery-based energy storage system in plants with cyclic load profile (typically steel plants) and its own electrical energy source – typically the steam turbine. There are several possible motivations and/or benefits to be explored. The paper focuses on the optimal sizing of the turbine and BESS in relation to the total costs of investment and operation. There is proposed a methodology of integration into these plants. A control strategy of Battery Energy Storage System (BESS) operation is proposed. The impact is put on the inclusion of all economically important factors. Finally, the case study is defined and evaluated, based on the steel plant load diagram and other key factors. The technical-economic potential of this application is discussed in the conclusion.
Název v anglickém jazyce
Economic Evaluation of Battery Energy Storage Integration into Plant with Cyclic Load
Popis výsledku anglicky
This paper deals with the simplified economic evaluation of the peak shaving by a battery-based energy storage system in plants with cyclic load profile (typically steel plants) and its own electrical energy source – typically the steam turbine. There are several possible motivations and/or benefits to be explored. The paper focuses on the optimal sizing of the turbine and BESS in relation to the total costs of investment and operation. There is proposed a methodology of integration into these plants. A control strategy of Battery Energy Storage System (BESS) operation is proposed. The impact is put on the inclusion of all economically important factors. Finally, the case study is defined and evaluated, based on the steel plant load diagram and other key factors. The technical-economic potential of this application is discussed in the conclusion.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20201 - Electrical and electronic engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
International Conference on Applied Electronics (AE 2022) : /proceedings/
ISBN
978-1-66549-481-6
ISSN
1803-7232
e-ISSN
1805-9597
Počet stran výsledku
4
Strana od-do
193-196
Název nakladatele
University of West Bohemia
Místo vydání
Pilsen
Místo konání akce
Pilsen, Czech Republic
Datum konání akce
6. 9. 2022
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—