THE BASE PERIMETR
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60162694%3AG43__%2F10%3A00421196" target="_blank" >RIV/60162694:G43__/10:00421196 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
THE BASE PERIMETR
Popis výsledku v původním jazyce
The article deals with the basic elements of the base perimeter. The base perimeter is an imaginary area that is needed to be supported by all available resources. The article describes different parts of the barrier protection, the perimeter protectionand the protection of buildings. In the article, there is mentioned the possible structure of the perimeter base. The security perimeter of the base is one of the most important parts of force protection. Ensuring of any base safety has to be based on the region and the situation in the surroundings. Another factor, which has an influence on the extent of security measures, is the operation estimated time in the area. These factors determine extent and cost of security measures. The article is preparedin accordance with the Defence Research Project named: ?Technical support of design, building, maintenance and cancelling of the Czech military bases in missions abroad, using the Reach-Back concept?
Název v anglickém jazyce
THE BASE PERIMETR
Popis výsledku anglicky
The article deals with the basic elements of the base perimeter. The base perimeter is an imaginary area that is needed to be supported by all available resources. The article describes different parts of the barrier protection, the perimeter protectionand the protection of buildings. In the article, there is mentioned the possible structure of the perimeter base. The security perimeter of the base is one of the most important parts of force protection. Ensuring of any base safety has to be based on the region and the situation in the surroundings. Another factor, which has an influence on the extent of security measures, is the operation estimated time in the area. These factors determine extent and cost of security measures. The article is preparedin accordance with the Defence Research Project named: ?Technical support of design, building, maintenance and cancelling of the Czech military bases in missions abroad, using the Reach-Back concept?
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
KA - Vojenství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/OVUOFVT200805" target="_blank" >OVUOFVT200805: RUCH - Technická podpora navrhování, výstavby, údržby a rušení základen AČR v zahraničních misích s využitím konceptu REACH-BACK</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
ICMT´10 ? IDEB´10 International Conference on Military Technologies 2010
ISBN
978-80-8075-454-9
ISSN
—
e-ISSN
—
Počet stran výsledku
12
Strana od-do
—
Název nakladatele
Neuveden
Místo vydání
Bratislava
Místo konání akce
Bratislava
Datum konání akce
1. 1. 2010
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—