Mathematical model for transporting sugar beet roots to sugar factory
Popis výsledku v původním jazyce
The aim of the paper is to propose a model for transporting sugar beet roots from a post-harvest storage to a sugar factory during the period of sugar campaign. Within the up-to-date technology of sugar beet harvest, roots are transported to the factoryonly after being cleaned in the grower?s field. The model includes therefore a cleaner-loader that will have to be moved only in a minimal degree. Moreover, it was assumed that daily delivery of roots must correspond with a 24-hour demand of the sugar factory. The proposed model can be used for creating the plan of delivery of the beet from the storage sites to the sugar factory during the campaign. Then over time, the model al-ready used many times will encompass a smaller and smaller set of storage sites. In the initial period of the campaign, there is a considerable possibility of choosing the stor-age sites where the total beet mass will equal the daily processing amount. However, it is possible that the set of solutions is be very
Název v anglickém jazyce
Mathematical model for transporting sugar beet roots to sugar factory
Popis výsledku anglicky
The aim of the paper is to propose a model for transporting sugar beet roots from a post-harvest storage to a sugar factory during the period of sugar campaign. Within the up-to-date technology of sugar beet harvest, roots are transported to the factoryonly after being cleaned in the grower?s field. The model includes therefore a cleaner-loader that will have to be moved only in a minimal degree. Moreover, it was assumed that daily delivery of roots must correspond with a 24-hour demand of the sugar factory. The proposed model can be used for creating the plan of delivery of the beet from the storage sites to the sugar factory during the campaign. Then over time, the model al-ready used many times will encompass a smaller and smaller set of storage sites. In the initial period of the campaign, there is a considerable possibility of choosing the stor-age sites where the total beet mass will equal the daily processing amount. However, it is possible that the set of solutions is be very
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
GA - Zemědělská ekonomie
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2007
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Trends in Agricultural Engineering 2007
ISBN
978-80-213-1668-3
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
428-431
Název nakladatele
Czech University of Life Sciences Prague
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
12. 9. 2007
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—