Preference Risk Assessment of Electric Power Critical Infrastructure
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27200%2F14%3A86089541" target="_blank" >RIV/61989100:27200/14:86089541 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.aidic.it/cet/14/36/079.pdf" target="_blank" >http://www.aidic.it/cet/14/36/079.pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3303/CET1436079" target="_blank" >10.3303/CET1436079</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Preference Risk Assessment of Electric Power Critical Infrastructure
Popis výsledku v původním jazyce
Risk assessment represents a complicated process in the course of which a subjective deliberate distortion of results must be avoided. Simultaneously, the evaluator should however be allowed to take into account his/her own preferences that give him/her,in return, a possibility of maximum use of acquired results of this assessment. For this purpose, authors present the article that deals with the problems of preference risk assessment in the area of electric power critical infrastructure. The essence of preference risk assessment is the employment of multi-criteria analysis (MCA) using the techniques of criteria hierarchy assessment or applying the methods based on quantification of utility function. Such a method of assessment enables the owners of electric power facilities and other stakeholders to prefer the assessment of specific risk kinds depending on the type of facility (generation, transmission and distribution) and the securing of required safety level. When studying the pre
Název v anglickém jazyce
Preference Risk Assessment of Electric Power Critical Infrastructure
Popis výsledku anglicky
Risk assessment represents a complicated process in the course of which a subjective deliberate distortion of results must be avoided. Simultaneously, the evaluator should however be allowed to take into account his/her own preferences that give him/her,in return, a possibility of maximum use of acquired results of this assessment. For this purpose, authors present the article that deals with the problems of preference risk assessment in the area of electric power critical infrastructure. The essence of preference risk assessment is the employment of multi-criteria analysis (MCA) using the techniques of criteria hierarchy assessment or applying the methods based on quantification of utility function. Such a method of assessment enables the owners of electric power facilities and other stakeholders to prefer the assessment of specific risk kinds depending on the type of facility (generation, transmission and distribution) and the securing of required safety level. When studying the pre
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
AQ - Bezpečnost a ochrana zdraví, člověk – stroj
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/VF20112015018" target="_blank" >VF20112015018: Bezpečnost občanů ? krizové řízení</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Chemical Engineering Transactions
ISBN
978-88-95608-27-3
ISSN
1974-9791
e-ISSN
—
Počet stran výsledku
6
Strana od-do
469-474
Název nakladatele
The Italian Association of Chemical Engineering
Místo vydání
Milano
Místo konání akce
Bologna
Datum konání akce
13. 4. 2014
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000346539900079