Model pro optimalizaci údržby vybrané rozvodny elektrické energie na Moravě
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27240%2F06%3A00013639" target="_blank" >RIV/61989100:27240/06:00013639 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Model for maintenance optimization of selected high voltage substation in Moravian power transmission system
Popis výsledku v původním jazyce
The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation 110/22 kV in different work states. The system is very complex -the substation 22 kV has two main busbars andone transfer busbar. There are sixteen outputs from the substation. The substation 22 kV has been chosen because it is very extensive power energy system in Czech Republic and we are able to obtain necessary data for the optimization. Detail model schemeof the HV substation 22 kV is demonstrated and analyzed within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized), the failure rate and mean time to repair -MTTR.
Název v anglickém jazyce
Model for maintenance optimization of selected high voltage substation in Moravian power transmission system
Popis výsledku anglicky
The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation 110/22 kV in different work states. The system is very complex -the substation 22 kV has two main busbars andone transfer busbar. There are sixteen outputs from the substation. The substation 22 kV has been chosen because it is very extensive power energy system in Czech Republic and we are able to obtain necessary data for the optimization. Detail model schemeof the HV substation 22 kV is demonstrated and analyzed within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized), the failure rate and mean time to repair -MTTR.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
BB - Aplikovaná statistika, operační výzkum
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2006
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Safety and Reliability for Managing Risk
ISBN
0-415-41620-5
ISSN
—
e-ISSN
—
Počet stran výsledku
2822
Strana od-do
483-489
Název nakladatele
Balkema publishers
Místo vydání
Leiden
Místo konání akce
—
Datum konání akce
—
Typ akce podle státní příslušnosti
—
Kód UT WoS článku
—