Energy Meter Results Under Fast Changing Energy Flow Condition
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27240%2F15%3A86096325" target="_blank" >RIV/61989100:27240/15:86096325 - isvavai.cz</a>
Výsledek na webu
<a href="https://www.researchgate.net/publication/283653277_Energy_meter_results_under_fast_changing_energy_flow_condition" target="_blank" >https://www.researchgate.net/publication/283653277_Energy_meter_results_under_fast_changing_energy_flow_condition</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Energy Meter Results Under Fast Changing Energy Flow Condition
Popis výsledku v původním jazyce
Many small photovoltaic power plants exists on the roofs of family houses in the Czech Republic. The power of such a power plants is up to 2kW. The state legislation for such a photovoltaic power plants emphasis on-site energy consumption by state paid so called green bonus. As a result of the green bonus state pays to power plant owner for energy consumed in-house 10 times more in comparison with energy supplied to the distribution grid. Described situation leads to high effort to consume as much energy as possible in-house and this is reached by using special device which switches quite fast big house appliances. This fast loads control brings fast changes in energy flow direction and this could lead to situation when electricity meter show no consumption or generation even there is energy flow. The paper describes such situation and methods for testing of electricity meters.
Název v anglickém jazyce
Energy Meter Results Under Fast Changing Energy Flow Condition
Popis výsledku anglicky
Many small photovoltaic power plants exists on the roofs of family houses in the Czech Republic. The power of such a power plants is up to 2kW. The state legislation for such a photovoltaic power plants emphasis on-site energy consumption by state paid so called green bonus. As a result of the green bonus state pays to power plant owner for energy consumed in-house 10 times more in comparison with energy supplied to the distribution grid. Described situation leads to high effort to consume as much energy as possible in-house and this is reached by using special device which switches quite fast big house appliances. This fast loads control brings fast changes in energy flow direction and this could lead to situation when electricity meter show no consumption or generation even there is energy flow. The paper describes such situation and methods for testing of electricity meters.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JA - Elektronika a optoelektronika, elektrotechnika
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings Of The 8th International Scientific Symposium On Electrical Power Engineering (Elektroenergetika 2015)
ISBN
978-80-553-2187-5
ISSN
—
e-ISSN
—
Počet stran výsledku
3
Strana od-do
133-135
Název nakladatele
TECHNICAL UNIV KOSICE, FAC ELECTRICAL ENGRG & INFORMATICS
Místo vydání
Košice
Místo konání akce
Stara Lesna
Datum konání akce
16. 9. 2015
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
000361561700030