Geodetické merania při výstavbe tunela Sitina
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F04%3A00011129" target="_blank" >RIV/61989100:27350/04:00011129 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Survey services at the Sitina tunnel conctruction.(Geodetické merania při výstavbe tunela Sitina )
Popis výsledku v původním jazyce
One of problems encountered when solving the traffic situation of the Bratislava bypass motorway is a section solving interconnection of the motorway D2 heading towards Brno. A critical point of this section is the Na Patrónke intersection. For that reason a decision was made to start the D2 motorway section from Lamačská Cesta to Staré Grunty in 2003. One of the most important structures along the route is the twin-tube motorway tunnel SITINA, passing under the Bratislava Z00 area.The SIT1NA tunnel consists of the western tunnel tube (1440 m long, out of this length 1 189 m mined section, 251 m cut -and-cover sections at the northern and southern portaU and 1 415 m long eastern tunnel tube (1 159 m mined, 220 m cut-and-cover sections at the northern and southern portal.Survey services provided at the SITINA tunnel construction can be divided into three major complexes:- Survey for the excavation guidance, primary lining as-built survey, and reprofiling of the tunnel- Establishment of
Název v anglickém jazyce
Survey services at the Sitina tunnel conctruction.(Geodetické merania při výstavbe tunela Sitina )
Popis výsledku anglicky
One of problems encountered when solving the traffic situation of the Bratislava bypass motorway is a section solving interconnection of the motorway D2 heading towards Brno. A critical point of this section is the Na Patrónke intersection. For that reason a decision was made to start the D2 motorway section from Lamačská Cesta to Staré Grunty in 2003. One of the most important structures along the route is the twin-tube motorway tunnel SITINA, passing under the Bratislava Z00 area.The SIT1NA tunnel consists of the western tunnel tube (1440 m long, out of this length 1 189 m mined section, 251 m cut -and-cover sections at the northern and southern portaU and 1 415 m long eastern tunnel tube (1 159 m mined, 220 m cut-and-cover sections at the northern and southern portal.Survey services provided at the SITINA tunnel construction can be divided into three major complexes:- Survey for the excavation guidance, primary lining as-built survey, and reprofiling of the tunnel- Establishment of
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
DH - Báňský průmysl včetně těžby a zpracování uhlí
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2004
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Tunel
ISSN
1211-0728
e-ISSN
—
Svazek periodika
2004
Číslo periodika v rámci svazku
4
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
56
Strana od-do
38-43
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—