Numerical modelling of the Brusnice tunnel
Popis výsledku v původním jazyce
The Brusnice tunnel is a part of the Blanka tunnel section. The mined section of the tunnel is about 550 m long, the tunnel has two tubes with the cross-sections of about 172 m2, the tubes are connected by two cross-passages. All excavations were realised using NATM. The tunnel was driven through the rock mass formed by the Prague Ordovician clayey shale, under rock overburden with a variable depth. The excavation of the northern tunnel tube (NTT) commenced from the Myslbekova portal in October 2009, using a horizontal sequencing (top heading, bench and invert). The excavation of the southern tunnel tube (STT) started at a time lag of three months. Taking into account results of the site investigation and the fact that a Baroque fortification wall wasto be passed under, vertical tunnel face sequencing was selected (side drifts and central pillar). Because of the improvement in the geological conditions, the STT excavation sequencing was changed to the horizontal system, after completi
Název v anglickém jazyce
Numerical modelling of the Brusnice tunnel
Popis výsledku anglicky
The Brusnice tunnel is a part of the Blanka tunnel section. The mined section of the tunnel is about 550 m long, the tunnel has two tubes with the cross-sections of about 172 m2, the tubes are connected by two cross-passages. All excavations were realised using NATM. The tunnel was driven through the rock mass formed by the Prague Ordovician clayey shale, under rock overburden with a variable depth. The excavation of the northern tunnel tube (NTT) commenced from the Myslbekova portal in October 2009, using a horizontal sequencing (top heading, bench and invert). The excavation of the southern tunnel tube (STT) started at a time lag of three months. Taking into account results of the site investigation and the fact that a Baroque fortification wall wasto be passed under, vertical tunnel face sequencing was selected (side drifts and central pillar). Because of the improvement in the geological conditions, the STT excavation sequencing was changed to the horizontal system, after completi
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/TA01011816" target="_blank" >TA01011816: Pravděpodobnostní hodnocení vstupních parametrů horninového masivu a spolehlivostní analýza podzemních konstrukcí s využitím numerických metod</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
1st Eastern European Tunneling Conference
ISBN
978-963-89638-0-2
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
—
Název nakladatele
OOK-Press Ltd.
Místo vydání
Veszprém
Místo konání akce
Budapest
Datum konání akce
18. 9. 2012
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—