Monitoring of Quarry Drill Rig Costs and Proposals for Their Reduction
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F18%3A10241475" target="_blank" >RIV/61989100:27350/18:10241475 - isvavai.cz</a>
Výsledek na webu
<a href="https://iopscience.iop.org/article/10.1088/1755-1315/221/1/012140" target="_blank" >https://iopscience.iop.org/article/10.1088/1755-1315/221/1/012140</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1755-1315/221/1/012140" target="_blank" >10.1088/1755-1315/221/1/012140</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Monitoring of Quarry Drill Rig Costs and Proposals for Their Reduction
Popis výsledku v původním jazyce
This article deals with issues of the quarry drill rigs operation. They are the rigs with top hammer, or down the hole hammer drills, primarily used during the preparation of blasting. The article is focused on the monitoring of costs and economic management. The introductory part of the article provides a description of all costs, and their division to fixed and variable costs. In the next part, figures of particular costs are provided for specific selected locations in the Czech Republic. Also, the article deals with proposals for the monitoring, evaluation, and reduction of the costs. Separately, the fixed costs are covered, with the evaluation of turn points in various conditions. The proposals for the reduction of variable costs are provided separately. In the article conclusion, summary of recommended measures is provided. Key words: drill rig, costs monitoring, blasting
Název v anglickém jazyce
Monitoring of Quarry Drill Rig Costs and Proposals for Their Reduction
Popis výsledku anglicky
This article deals with issues of the quarry drill rigs operation. They are the rigs with top hammer, or down the hole hammer drills, primarily used during the preparation of blasting. The article is focused on the monitoring of costs and economic management. The introductory part of the article provides a description of all costs, and their division to fixed and variable costs. In the next part, figures of particular costs are provided for specific selected locations in the Czech Republic. Also, the article deals with proposals for the monitoring, evaluation, and reduction of the costs. Separately, the fixed costs are covered, with the evaluation of turn points in various conditions. The proposals for the reduction of variable costs are provided separately. In the article conclusion, summary of recommended measures is provided. Key words: drill rig, costs monitoring, blasting
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20703 - Mining and mineral processing
Návaznosti výsledku
Projekt
—
Návaznosti
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
IOP Conference Series: Earth and Environmental Science. Volume 221
ISBN
—
ISSN
1755-1307
e-ISSN
1755-1315
Počet stran výsledku
14
Strana od-do
1-14
Název nakladatele
IOP Publishing
Místo vydání
Bristol
Místo konání akce
Praha
Datum konání akce
3. 9. 2018
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—