Analysis of the quality assurance results from the initial part of production of the ATLAS18 ITK strip sensors
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68378271%3A_____%2F24%3A00602097" target="_blank" >RIV/68378271:_____/24:00602097 - isvavai.cz</a>
Výsledek na webu
<a href="https://hdl.handle.net/11104/0359304" target="_blank" >https://hdl.handle.net/11104/0359304</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.nima.2024.169435" target="_blank" >10.1016/j.nima.2024.169435</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Analysis of the quality assurance results from the initial part of production of the ATLAS18 ITK strip sensors
Popis výsledku v původním jazyce
The production of strip sensors for the ATLAS Inner Tracker (ITk) started in 2021. Since then, a Quality Assurance (QA) program has been carried out continuously, by using specific test structures, in parallel to the Quality Control (QC) inspection of the sensors. The QA program consists of monitoring sensor-specific characteristics and the technological process variability, before and after the irradiation with gammas, neutrons, and protons. After two years, half of the full production volume has been reached and we present an analysis of the parameters measured as part of the QA process. The main devices used for QA purposes are miniature strip sensors, monitor diodes, and the ATLAS test chip, which contains several test structures. Such devices are tested by several sites across the collaboration depending on the type of samples (non-irradiated components or irradiated with protons, neutrons, or gammas).
Název v anglickém jazyce
Analysis of the quality assurance results from the initial part of production of the ATLAS18 ITK strip sensors
Popis výsledku anglicky
The production of strip sensors for the ATLAS Inner Tracker (ITk) started in 2021. Since then, a Quality Assurance (QA) program has been carried out continuously, by using specific test structures, in parallel to the Quality Control (QC) inspection of the sensors. The QA program consists of monitoring sensor-specific characteristics and the technological process variability, before and after the irradiation with gammas, neutrons, and protons. After two years, half of the full production volume has been reached and we present an analysis of the parameters measured as part of the QA process. The main devices used for QA purposes are miniature strip sensors, monitor diodes, and the ATLAS test chip, which contains several test structures. Such devices are tested by several sites across the collaboration depending on the type of samples (non-irradiated components or irradiated with protons, neutrons, or gammas).
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
10303 - Particles and field physics
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2024
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Nuclear Instruments & Methods in Physics Research Section A
ISSN
0168-9002
e-ISSN
1872-9576
Svazek periodika
1064
Číslo periodika v rámci svazku
July
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
8
Strana od-do
169435
Kód UT WoS článku
001252172700001
EID výsledku v databázi Scopus
2-s2.0-85194363597