Dvě zpětné analýzy stability založené na kontrolním sledování
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F11%3A00191656" target="_blank" >RIV/68407700:21110/11:00191656 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
čeština
Název v původním jazyce
Dvě zpětné analýzy stability založené na kontrolním sledování
Popis výsledku v původním jazyce
An open-pit coal mine in the Czech Republic is under reclamation which forms a large lake inside. One side-slope about 40 hectares is still not stable. The slope has two different parts. The upper one with a small inclination consists mainly of "virgin"ground not directly affected by mining. The lower part is a side slope formed by former stripping partly supported by an internal waste dump. A long anchored pile wall has been designed as a support of the upper part of the area. In the lower part a hugestabilisation embankment on the internal waste dump is under construction. The existing monitoring was extended in 2007 in order to prove efficiency of remedial measures. The embankment is instrumented and monitored with respect to its construction phases. Besides the control of the construction process, all gathered monitoring results are used for reverse analyses. A parameter study based on a link of knowledge gained by boring for site instrumentation, CPT applied for installation of
Název v anglickém jazyce
Two back analyses of stability based on site monitoring
Popis výsledku anglicky
An open-pit coal mine in the Czech Republic is under reclamation which forms a large lake inside. One side-slope about 40 hectares is still not stable. The slope has two different parts. The upper one with a small inclination consists mainly of "virgin"ground not directly affected by mining. The lower part is a side slope formed by former stripping partly supported by an internal waste dump. A long anchored pile wall has been designed as a support of the upper part of the area. In the lower part a hugestabilisation embankment on the internal waste dump is under construction. The existing monitoring was extended in 2007 in order to prove efficiency of remedial measures. The embankment is instrumented and monitored with respect to its construction phases. Besides the control of the construction process, all gathered monitoring results are used for reverse analyses. A parameter study based on a link of knowledge gained by boring for site instrumentation, CPT applied for installation of
Klasifikace
Druh
C - Kapitola v odborné knize
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název knihy nebo sborníku
Přírodní katastrofy (optimalizace ochrany, interakce se stavebními konstrukcemi)
ISBN
978-80-01-04735-4
Počet stran výsledku
8
Strana od-do
1-8
Počet stran knihy
200
Název nakladatele
České vysoké učení technické v Praze
Místo vydání
Praha
Kód UT WoS kapitoly
—