Probabilistic assessment of tunnel construction performance based on data
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F13%3A00202014" target="_blank" >RIV/68407700:21110/13:00202014 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1016/j.tust.2013.02.006" target="_blank" >http://dx.doi.org/10.1016/j.tust.2013.02.006</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.tust.2013.02.006" target="_blank" >10.1016/j.tust.2013.02.006</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Probabilistic assessment of tunnel construction performance based on data
Popis výsledku v původním jazyce
A probabilistic model for estimating tunnel excavation time is learnt with data from past tunnel projects. The model is based on the Dynamic Bayesian Network technique. The model inputs are determined through an analysis of data from three tunnels builtby means of the conventional tunneling method. The data motivate the development of a novel probability distribution to describe the excavation performance. In addition, the probability of construction failure events and the delay caused by such failuresare estimated using databases available in the literature. The model is applied to a case study, in which it is demonstrated how observations from the tunnel construction process can be included to continuously update the prediction of excavation time.
Název v anglickém jazyce
Probabilistic assessment of tunnel construction performance based on data
Popis výsledku anglicky
A probabilistic model for estimating tunnel excavation time is learnt with data from past tunnel projects. The model is based on the Dynamic Bayesian Network technique. The model inputs are determined through an analysis of data from three tunnels builtby means of the conventional tunneling method. The data motivate the development of a novel probability distribution to describe the excavation performance. In addition, the probability of construction failure events and the delay caused by such failuresare estimated using databases available in the literature. The model is applied to a case study, in which it is demonstrated how observations from the tunnel construction process can be included to continuously update the prediction of excavation time.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Tunnelling and Underground Space Technology
ISSN
0886-7798
e-ISSN
—
Svazek periodika
2013
Číslo periodika v rámci svazku
37
Stát vydavatele periodika
GB - Spojené království Velké Británie a Severního Irska
Počet stran výsledku
17
Strana od-do
62-78
Kód UT WoS článku
000320221000007
EID výsledku v databázi Scopus
—