Multicriteria Decision Making of Structure Type Bridge Selection
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F13%3A00206395" target="_blank" >RIV/68407700:21110/13:00206395 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Multicriteria Decision Making of Structure Type Bridge Selection
Popis výsledku v původním jazyce
Construction costs should not be the only one criterion for variant selection of bridge construction type. Life cycle costs calculation for each variant is necessary to proper decision making about variant selection. The cheaper variant in construction phase can be economically less advantageous during usage phase than the variant with higher investment costs but lower operating costs. The paper deals with the question how to evaluate and compare the life cycle cost of bridge objects. Life cycle costs of bridge are derived mainly from the bridge construction type (coupled, steel, monolithic, prefabricated ? prestressed, not prestressed). A detailed calculation of costs is at the level of individual structural elements of the bridge. Each structural element has its own life cycle and maintenance and renewal costs. However, structural elements interact, which has an impact on the individual life cycles for structural elements. The paper presents a tool for calculating life cycle costs of
Název v anglickém jazyce
Multicriteria Decision Making of Structure Type Bridge Selection
Popis výsledku anglicky
Construction costs should not be the only one criterion for variant selection of bridge construction type. Life cycle costs calculation for each variant is necessary to proper decision making about variant selection. The cheaper variant in construction phase can be economically less advantageous during usage phase than the variant with higher investment costs but lower operating costs. The paper deals with the question how to evaluate and compare the life cycle cost of bridge objects. Life cycle costs of bridge are derived mainly from the bridge construction type (coupled, steel, monolithic, prefabricated ? prestressed, not prestressed). A detailed calculation of costs is at the level of individual structural elements of the bridge. Each structural element has its own life cycle and maintenance and renewal costs. However, structural elements interact, which has an impact on the individual life cycles for structural elements. The paper presents a tool for calculating life cycle costs of
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
CESB 13 Central Europe towards Sustainable Building 2013
ISBN
978-80-247-5018-7
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
939-942
Název nakladatele
GRADA PUBLISHING
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
26. 6. 2013
Typ akce podle státní příslušnosti
CST - Celostátní akce
Kód UT WoS článku
—