Innovation in Bridge Life-cycle Cost Assessment
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00314284" target="_blank" >RIV/68407700:21110/17:00314284 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.1016/j.proeng.2017.07.222" target="_blank" >https://doi.org/10.1016/j.proeng.2017.07.222</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.proeng.2017.07.222" target="_blank" >10.1016/j.proeng.2017.07.222</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Innovation in Bridge Life-cycle Cost Assessment
Popis výsledku v původním jazyce
State administration authorities put pressure on effective management of public funds. The paper focuses on economical construction of civil engineering works - bridges. Bridges involve high investment costs, but, because of their estimated service life (100 years), significant operating costs are incurred associated with the maintenance and renovation of individual structural elements. The trend in tendering not only considers the investment cost amounts, but also takes into account the expected operating costs of completed structures. The Life Cycle Costing Methods for bridges are still under development and need further improvement so that the output data correspond to reality as much as possible. The paper summarizes the existing procedures and presents the latest innovations in modelling the life cycle costs of bridges built last year. These particularly relate to the cost basis update, but also revaluation of replacement cycles of individual structural elements, which is based on the latest technical knowledge resulting from real conditions of serviced bridges. The greatest innovation, however, is the computational model's linking onto two separate pricing databases. The calculation of maintenance costs is based on operational and expert data, broken into different bridge types. The replacement costs of individual structural elements are linked onto the database which is based on prices from designers. In this way, various technological demands for individual versions as suggested by designers are better captured, but, at the same time, maintenance costs, which are not subject to designers’ pricing, will not be distorted. The paper presents a real tendering case which shows to what extent operating costs can affect the selection of the best version.
Název v anglickém jazyce
Innovation in Bridge Life-cycle Cost Assessment
Popis výsledku anglicky
State administration authorities put pressure on effective management of public funds. The paper focuses on economical construction of civil engineering works - bridges. Bridges involve high investment costs, but, because of their estimated service life (100 years), significant operating costs are incurred associated with the maintenance and renovation of individual structural elements. The trend in tendering not only considers the investment cost amounts, but also takes into account the expected operating costs of completed structures. The Life Cycle Costing Methods for bridges are still under development and need further improvement so that the output data correspond to reality as much as possible. The paper summarizes the existing procedures and presents the latest innovations in modelling the life cycle costs of bridges built last year. These particularly relate to the cost basis update, but also revaluation of replacement cycles of individual structural elements, which is based on the latest technical knowledge resulting from real conditions of serviced bridges. The greatest innovation, however, is the computational model's linking onto two separate pricing databases. The calculation of maintenance costs is based on operational and expert data, broken into different bridge types. The replacement costs of individual structural elements are linked onto the database which is based on prices from designers. In this way, various technological demands for individual versions as suggested by designers are better captured, but, at the same time, maintenance costs, which are not subject to designers’ pricing, will not be distorted. The paper presents a real tendering case which shows to what extent operating costs can affect the selection of the best version.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20102 - Construction engineering, Municipal and structural engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Procedia Engineering
ISBN
—
ISSN
1877-7058
e-ISSN
1877-7058
Počet stran výsledku
6
Strana od-do
441-446
Název nakladatele
Elsevier B.V.
Místo vydání
Amsterdam
Místo konání akce
Primosten
Datum konání akce
19. 6. 2017
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000418465300058