Track TurnoverTunnel behind the Motol Station - Metro VA
Popis výsledku v původním jazyce
Twintrack running tunnel of the track turnover behind the Motol station is the part of section 09 Station Motol of the Prague metro extension project. Section is situated between station construction pit and construction pit intended for the ventilationhouse. Both the twintrack tunnel and station Motol are situated in the area of Prague fault. Geological conditions of the Motol area are quite complicated. Frequent changes of different strata, theirs weathering and disruption by the faults were the major conditions for the tunnel execution along with significant impact of water head level. The tunnel has been originally considered as NATM tunnel along the whole length. The alignment in the close vicinity of the station Motol along with sloping region and found geological conditions led the Investor to the decision of changing the technology of the part of the tunnel. Originally 400m long NATM tunnel has been divided into 2 parts with approximately equal lengths ? NATM section and 20m d
Název v anglickém jazyce
Track TurnoverTunnel behind the Motol Station - Metro VA
Popis výsledku anglicky
Twintrack running tunnel of the track turnover behind the Motol station is the part of section 09 Station Motol of the Prague metro extension project. Section is situated between station construction pit and construction pit intended for the ventilationhouse. Both the twintrack tunnel and station Motol are situated in the area of Prague fault. Geological conditions of the Motol area are quite complicated. Frequent changes of different strata, theirs weathering and disruption by the faults were the major conditions for the tunnel execution along with significant impact of water head level. The tunnel has been originally considered as NATM tunnel along the whole length. The alignment in the close vicinity of the station Motol along with sloping region and found geological conditions led the Investor to the decision of changing the technology of the part of the tunnel. Originally 400m long NATM tunnel has been divided into 2 parts with approximately equal lengths ? NATM section and 20m d
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/TA01011816" target="_blank" >TA01011816: Pravděpodobnostní hodnocení vstupních parametrů horninového masivu a spolehlivostní analýza podzemních konstrukcí s využitím numerických metod</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Podzemní stavby Praha 2013
ISBN
978-80-260-3867-2
ISSN
—
e-ISSN
—
Počet stran výsledku
1
Strana od-do
28
Název nakladatele
Česká tunelářská asociace ITA-AITES
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
22. 4. 2013
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—