Airtightness of a multi-family passive residential building in the Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F13%3A00216259" target="_blank" >RIV/68407700:21110/13:00216259 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.buildair.eu/homepage.html?Itemid=42" target="_blank" >http://www.buildair.eu/homepage.html?Itemid=42</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Airtightness of a multi-family passive residential building in the Czech Republic
Popis výsledku v původním jazyce
During the construction of a multi-family residential building the developer decided that the building must comply with the airtightness requirements for passive houses. Based on inspection work and preliminary testing, the original design was revised. The execution of the new air barrier system was supervised. Selected flats were repeatedly tested during the construction process. The whole building was tested once before the completion of the construction. After the completion of the building, all theflats, the whole building and the staircase were tested again. In order to evaluate the effectiveness of the designed air barrier system, a very similar ?standard? building of the same development was tested under the same conditions. The airtightness deteriorated during the building process, which proves the need of control until the completion of the building. The test results of particular flats were worse than the whole building test results due to the internal leakage (it points out
Název v anglickém jazyce
Airtightness of a multi-family passive residential building in the Czech Republic
Popis výsledku anglicky
During the construction of a multi-family residential building the developer decided that the building must comply with the airtightness requirements for passive houses. Based on inspection work and preliminary testing, the original design was revised. The execution of the new air barrier system was supervised. Selected flats were repeatedly tested during the construction process. The whole building was tested once before the completion of the construction. After the completion of the building, all theflats, the whole building and the staircase were tested again. In order to evaluate the effectiveness of the designed air barrier system, a very similar ?standard? building of the same development was tested under the same conditions. The airtightness deteriorated during the building process, which proves the need of control until the completion of the building. The test results of particular flats were worse than the whole building test results due to the internal leakage (it points out
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů