Cost estimation in BIM for transportation constructions in Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00332236" target="_blank" >RIV/68407700:21110/19:00332236 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1088/1755-1315/290/1/012065" target="_blank" >http://dx.doi.org/10.1088/1755-1315/290/1/012065</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1755-1315/290/1/012065" target="_blank" >10.1088/1755-1315/290/1/012065</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Cost estimation in BIM for transportation constructions in Czech Republic
Popis výsledku v původním jazyce
Detailed and precise drafts of competition are key to successful BIM implementation in Czech localization, as they are used for creating BIM model and they are further worked with. This can only be ensured by specifications in contract – as far as information model and Cost management (CM) are concerned, the specifications required are data appointment and Execution plan of building information modeling which both should be included in contract. The data defined in these documents carry great potential for further use within building information modeling, realization and operation, and they have not yet been used to full extent of their potential. This paper explores what should be included in the above suggested key documents from CM point of view and also what is the current level of construction documentation in transportation engineering in the Czech Republic.
Název v anglickém jazyce
Cost estimation in BIM for transportation constructions in Czech Republic
Popis výsledku anglicky
Detailed and precise drafts of competition are key to successful BIM implementation in Czech localization, as they are used for creating BIM model and they are further worked with. This can only be ensured by specifications in contract – as far as information model and Cost management (CM) are concerned, the specifications required are data appointment and Execution plan of building information modeling which both should be included in contract. The data defined in these documents carry great potential for further use within building information modeling, realization and operation, and they have not yet been used to full extent of their potential. This paper explores what should be included in the above suggested key documents from CM point of view and also what is the current level of construction documentation in transportation engineering in the Czech Republic.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Central Europe towards Sustainable Building (CESB19)
ISBN
—
ISSN
1755-1307
e-ISSN
1755-1315
Počet stran výsledku
8
Strana od-do
—
Název nakladatele
IOP Publishing Ltd
Místo vydání
Bristol
Místo konání akce
Praha
Datum konání akce
2. 7. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—