Financial Evaulation of the BIM Model Coordination Process in Construction
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F24%3A00378592" target="_blank" >RIV/68407700:21110/24:00378592 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.14311/bit.2024.02.11" target="_blank" >https://doi.org/10.14311/bit.2024.02.11</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.14311/bit.2024.02.11" target="_blank" >10.14311/bit.2024.02.11</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Financial Evaulation of the BIM Model Coordination Process in Construction
Popis výsledku v původním jazyce
Although the decision whether to use the BIM method for a project has many factors, the purpose of this work is to describe financial benefits that comes with using the method in the field of project coordination in design phase. On the following pages it will be described how the tools of the BIM method can be used to detect collisions in comparison to performing classical coordination only using 2D coordination and visual inspection. The cost of removing the collisions will be determined for the case in which it would not have been detected during the design phase, but the collision is dealt with during construction. The difference between BIM and classical detections will be determined as the added value of using BIM method.
Název v anglickém jazyce
Financial Evaulation of the BIM Model Coordination Process in Construction
Popis výsledku anglicky
Although the decision whether to use the BIM method for a project has many factors, the purpose of this work is to describe financial benefits that comes with using the method in the field of project coordination in design phase. On the following pages it will be described how the tools of the BIM method can be used to detect collisions in comparison to performing classical coordination only using 2D coordination and visual inspection. The cost of removing the collisions will be determined for the case in which it would not have been detected during the design phase, but the collision is dealt with during construction. The difference between BIM and classical detections will be determined as the added value of using BIM method.
Klasifikace
Druh
J<sub>ost</sub> - Ostatní články v recenzovaných periodicích
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
V - Vyzkumna aktivita podporovana z jinych verejnych zdroju
Ostatní
Rok uplatnění
2024
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Business & IT
ISSN
1805-3777
e-ISSN
2570-7434
Svazek periodika
2
Číslo periodika v rámci svazku
11
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
10
Strana od-do
117-126
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—