Case study of transport options for CO2 from IGCC coal power plant in the Czech Republic for storage
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F16%3A00310374" target="_blank" >RIV/68407700:21220/16:00310374 - isvavai.cz</a>
Výsledek na webu
<a href="https://www.researchgate.net/publication/309716060_Case_study_of_transport_options_for_CO2_from_IGCC_coal_power_plant_in_the_Czech_Republic_for_storage" target="_blank" >https://www.researchgate.net/publication/309716060_Case_study_of_transport_options_for_CO2_from_IGCC_coal_power_plant_in_the_Czech_Republic_for_storage</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Case study of transport options for CO2 from IGCC coal power plant in the Czech Republic for storage
Popis výsledku v původním jazyce
This paper presents a case study of several options for CO2 transport from an Integrated Gasification Combined Cycle (IGCC) power plant with integrated CCS. The modelled case input comes from a hypothetical IGCC plant fuelled with lignite and using solvent pre-combustion capture method (Rectisol) located in the Czech Republic. After presenting a fundamental model for CO2 transport (in gas and liquid form), there are presented results for two different storage sites (onshore and offshore). The onshore storage is located approximately 23 km from the power plant. The offshore storage option is located in the North Sea and considers transporting of the CO2 to the assumed European CO2 transport connection point located approximately 500 km from the power plant. For each of these options two means of transport will be considered, first by pipeline in gaseous form and second as a liquefied CO2 by train. Finally, the fundamentals results of technical and economic impacts are presented for all analysed cases of CO2 transport in gas form.
Název v anglickém jazyce
Case study of transport options for CO2 from IGCC coal power plant in the Czech Republic for storage
Popis výsledku anglicky
This paper presents a case study of several options for CO2 transport from an Integrated Gasification Combined Cycle (IGCC) power plant with integrated CCS. The modelled case input comes from a hypothetical IGCC plant fuelled with lignite and using solvent pre-combustion capture method (Rectisol) located in the Czech Republic. After presenting a fundamental model for CO2 transport (in gas and liquid form), there are presented results for two different storage sites (onshore and offshore). The onshore storage is located approximately 23 km from the power plant. The offshore storage option is located in the North Sea and considers transporting of the CO2 to the assumed European CO2 transport connection point located approximately 500 km from the power plant. For each of these options two means of transport will be considered, first by pipeline in gaseous form and second as a liquefied CO2 by train. Finally, the fundamentals results of technical and economic impacts are presented for all analysed cases of CO2 transport in gas form.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
V - Vyzkumna aktivita podporovana z jinych verejnych zdroju
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 4 th International Conference on Chemical Technology
ISBN
978-80-86238-94-4
ISSN
2336-811X
e-ISSN
—
Počet stran výsledku
6
Strana od-do
315-320
Název nakladatele
Česká společnost průmyslové chemie
Místo vydání
Praha
Místo konání akce
Mikulov
Datum konání akce
25. 4. 2016
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—