Methodology for Processing the Risk Management Plan for Selected Assets of Transport Infrastructure
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F23%3A00371732" target="_blank" >RIV/68407700:21220/23:00371732 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.3850/978-981-18-8071-1_P170-cd" target="_blank" >https://doi.org/10.3850/978-981-18-8071-1_P170-cd</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3850/978-981-18-8071-1_P170-cd" target="_blank" >10.3850/978-981-18-8071-1_P170-cd</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Methodology for Processing the Risk Management Plan for Selected Assets of Transport Infrastructure
Popis výsledku v původním jazyce
To ensure the safety of human society, managers of critical elements of the transport infrastructure need to have a tool to ensure a quality response, because major failures of elements of critical transport infrastructure also mean an impact on the functionality and prosperity of the territory, sometimes even in the long term. Response must be ensured in all aspects: organizational; technical; personal; knowledge; financial and meth-odological. In accordance with the ISO 31000 standard, a risk management plan for a specific critical item contributes to the preparation of a timely and rapid response at the manager side. We present a methodology for processing the risk management plan for followed items of the transport system.
Název v anglickém jazyce
Methodology for Processing the Risk Management Plan for Selected Assets of Transport Infrastructure
Popis výsledku anglicky
To ensure the safety of human society, managers of critical elements of the transport infrastructure need to have a tool to ensure a quality response, because major failures of elements of critical transport infrastructure also mean an impact on the functionality and prosperity of the territory, sometimes even in the long term. Response must be ensured in all aspects: organizational; technical; personal; knowledge; financial and meth-odological. In accordance with the ISO 31000 standard, a risk management plan for a specific critical item contributes to the preparation of a timely and rapid response at the manager side. We present a methodology for processing the risk management plan for followed items of the transport system.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
21100 - Other engineering and technologies
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2023
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 33rd European Safety and Reliability Conference (ESREL 2023)
ISBN
978-981-18-8071-1
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
1910-1917
Název nakladatele
Research Publishing Services
Místo vydání
Singapore
Místo konání akce
Southampton
Datum konání akce
3. 9. 2023
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—