Robust control of a hybrid power plant considering uncertainty of ancillary service
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F25%3A00384966" target="_blank" >RIV/68407700:21220/25:00384966 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21230/25:00384966 RIV/68407700:21730/25:00384966
Výsledek na webu
<a href="https://doi.org/10.1049/icp.2025.2386" target="_blank" >https://doi.org/10.1049/icp.2025.2386</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1049/icp.2025.2386" target="_blank" >10.1049/icp.2025.2386</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Robust control of a hybrid power plant considering uncertainty of ancillary service
Popis výsledku v původním jazyce
This paper deals with the control problem of a hybrid power plant consisting of six gas turbines and a battery energy storage system. The peculiarity of the plant is that it is designed to provide an ancillary service only, namely Automatic Frequency Restoration Reserve (aFRR). When the plant’s aFRR reserve capacity is not activated, the turbines remain idle (non-spinning) and are activated (spinning) only when needed during the aFRR activation. Thus, the control is responsible for switching the turbines between non-spinning and spinning reserves without affecting the quality of service. The control problem of unit commitment and subsequent economic dispatch is formulated as an optimisation problem. To ensure the robustness of the solution, the paper proposes an efficient method that prevents a non-robust solution through the use of lazy constraints. The approach is validated by experimental results using a digital twin of a real power plant, and the paper discusses the additional costs and benefits associated with the proposed robust strategy.
Název v anglickém jazyce
Robust control of a hybrid power plant considering uncertainty of ancillary service
Popis výsledku anglicky
This paper deals with the control problem of a hybrid power plant consisting of six gas turbines and a battery energy storage system. The peculiarity of the plant is that it is designed to provide an ancillary service only, namely Automatic Frequency Restoration Reserve (aFRR). When the plant’s aFRR reserve capacity is not activated, the turbines remain idle (non-spinning) and are activated (spinning) only when needed during the aFRR activation. Thus, the control is responsible for switching the turbines between non-spinning and spinning reserves without affecting the quality of service. The control problem of unit commitment and subsequent economic dispatch is formulated as an optimisation problem. To ensure the robustness of the solution, the paper proposes an efficient method that prevents a non-robust solution through the use of lazy constraints. The approach is validated by experimental results using a digital twin of a real power plant, and the paper discusses the additional costs and benefits associated with the proposed robust strategy.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20205 - Automation and control systems
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2025
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
IET Conference Proceedings 9th Hybrid Power Plants & Systems Workshop (HYB 2025)
ISBN
—
ISSN
2732-4494
e-ISSN
2732-4494
Počet stran výsledku
9
Strana od-do
164-172
Název nakladatele
The Institution of Engineering and Technology (IET)
Místo vydání
Stevenage, Herts
Místo konání akce
Aland
Datum konání akce
3. 6. 2025
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—