Plánování podpůrných služeb pro zabezpečení přenosové soustavy
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F09%3A03156166" target="_blank" >RIV/68407700:21230/09:03156166 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Planning of Ancillary Services Securing Power System
Popis výsledku v původním jazyce
Procuring sufficient amount of operational reserves used by the Transmission System Operator (TSO) for keeping a balance between generation and load in real-time is a complex task. Extensive balancing power reserves enable keeping the Area Control Error(ACE) close to zero most of the time but the cost of enabling these reserves might be very high. The paper proposes a method of planning sufficient amount of operational reserves or rather Ancillary Services on economical basis. The goal of the presentedalgorithm is to find AS combination that minimize the cost of AS reservation and at the same time secures transmission system operations. Monte-Carlo simulation scheme of the area operation provides sufficient insight to ACE behavior under different operational reserves. Branch and Bound search scheme is applied to arrive at the best compromise between power security and cost of AS procurement. Short term, one month planning horizon is considered
Název v anglickém jazyce
Planning of Ancillary Services Securing Power System
Popis výsledku anglicky
Procuring sufficient amount of operational reserves used by the Transmission System Operator (TSO) for keeping a balance between generation and load in real-time is a complex task. Extensive balancing power reserves enable keeping the Area Control Error(ACE) close to zero most of the time but the cost of enabling these reserves might be very high. The paper proposes a method of planning sufficient amount of operational reserves or rather Ancillary Services on economical basis. The goal of the presentedalgorithm is to find AS combination that minimize the cost of AS reservation and at the same time secures transmission system operations. Monte-Carlo simulation scheme of the area operation provides sufficient insight to ACE behavior under different operational reserves. Branch and Bound search scheme is applied to arrive at the best compromise between power security and cost of AS procurement. Short term, one month planning horizon is considered
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/1M0567" target="_blank" >1M0567: Centrum aplikované kybernetiky</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2009
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
8 EEEIC International Conference on Environment and Electrical Engineering
ISBN
978-3-940471-10-9
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
—
Název nakladatele
Wroclaw University of Technology
Místo vydání
Wroclaw
Místo konání akce
Karpacz
Datum konání akce
10. 5. 2009
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—