Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F12%3A00194256" target="_blank" >RIV/68407700:21230/12:00194256 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization
Popis výsledku v původním jazyce
We study the RCPSP problem with alternative process plans where the goal is to minimize the total changeover cost given by all performed changeovers. A special attention is paid to the model that includes deadlines and covers a possibility to define morealternative ways how to complete the project. A selection of activities present in the schedule influences both decision (finding a feasible schedule) and optimization problem. We propose a heuristic based on local search that is performed in a shiftingtime window. The heuristic is able to handle large scale instances in an efficient manner.
Název v anglickém jazyce
Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization
Popis výsledku anglicky
We study the RCPSP problem with alternative process plans where the goal is to minimize the total changeover cost given by all performed changeovers. A special attention is paid to the model that includes deadlines and covers a possibility to define morealternative ways how to complete the project. A selection of activities present in the schedule influences both decision (finding a feasible schedule) and optimization problem. We propose a heuristic based on local search that is performed in a shiftingtime window. The heuristic is able to handle large scale instances in an efficient manner.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
JD - Využití počítačů, robotika a její aplikace
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GAP103%2F12%2F1994" target="_blank" >GAP103/12/1994: Adaptivní algoritmy pro rozvrhování a optimalizaci distribuovaných vestavěných real-time systémů</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů