Scheduling Jobs with Stochastic Processing Time on Parallel Identical Machines
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F19%3A00332434" target="_blank" >RIV/68407700:21230/19:00332434 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21730/19:00332434
Výsledek na webu
<a href="https://www.ijcai.org/proceedings/2019/0781.pdf" target="_blank" >https://www.ijcai.org/proceedings/2019/0781.pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.24963/ijcai.2019/781" target="_blank" >10.24963/ijcai.2019/781</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Scheduling Jobs with Stochastic Processing Time on Parallel Identical Machines
Popis výsledku v původním jazyce
Many real-world scheduling problems are characterized by uncertain parameters. In this paper, we study a classical parallel machine scheduling problem where the processing time of jobs is given by a normal distribution. The objective is to maximize the probability that jobs are completed before a given common due date. This study focuses on the computational aspect of this problem, and it proposes a Branch-and-Price approach for solving it. The advantage of our method is that it scales very well with the increasing number of machines and is easy to implement. Furthermore, we propose an efficient lower bound heuristics. The experimental results show that our method outperforms the existing approaches.
Název v anglickém jazyce
Scheduling Jobs with Stochastic Processing Time on Parallel Identical Machines
Popis výsledku anglicky
Many real-world scheduling problems are characterized by uncertain parameters. In this paper, we study a classical parallel machine scheduling problem where the processing time of jobs is given by a normal distribution. The objective is to maximize the probability that jobs are completed before a given common due date. This study focuses on the computational aspect of this problem, and it proposes a Branch-and-Price approach for solving it. The advantage of our method is that it scales very well with the increasing number of machines and is easy to implement. Furthermore, we propose an efficient lower bound heuristics. The experimental results show that our method outperforms the existing approaches.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
Návaznosti výsledku
Projekt
<a href="/cs/project/EG15_019%2F0004688" target="_blank" >EG15_019/0004688: Továrna budoucnosti - Flexibilní, optimalizované a sledovatelné produkční systémy</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the Twenty-Eighth International Joint Conference on Artificial Intelligence
ISBN
978-0-9992411-4-1
ISSN
—
e-ISSN
1045-0823
Počet stran výsledku
7
Strana od-do
5628-5634
Název nakladatele
International Joint Conferences on Artificial Intelligence Organization
Místo vydání
—
Místo konání akce
Macau
Datum konání akce
10. 8. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—