Evaluation of a new timetable koncept on the track Praha - Kladno using a simulation tool
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F09%3A00166867" target="_blank" >RIV/68407700:21260/09:00166867 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Evaluation of a new timetable koncept on the track Praha - Kladno using a simulation tool
Popis výsledku v původním jazyce
On behalf of České dráhy (the Czech Railways) a railway operation model for the railway track Praha - Kladno was compiled using the Swiss simulation tool "Opentrack". The aim of the study was to proof the feasibility and robustness of a new timetable concept, which slightly raised the traffic intensity. The study proved the feasibility and pointed out the critical moments of the planned concept. It especially simulated the possible effects of operation irregularities at the critical points. To proof therobustness of the timetable a 5-15 minutes entry delay was simulated for every train in the planned work-day timetable. The conclusions of the simulation were later projected into specific dispatching issues for every station dispatcher as well as the overall operations control. Apparently thanks to the results of the study the influence of delays on this track was minimized. This was an important contribution to improve the marketing image of the new timetable.
Název v anglickém jazyce
Evaluation of a new timetable koncept on the track Praha - Kladno using a simulation tool
Popis výsledku anglicky
On behalf of České dráhy (the Czech Railways) a railway operation model for the railway track Praha - Kladno was compiled using the Swiss simulation tool "Opentrack". The aim of the study was to proof the feasibility and robustness of a new timetable concept, which slightly raised the traffic intensity. The study proved the feasibility and pointed out the critical moments of the planned concept. It especially simulated the possible effects of operation irregularities at the critical points. To proof therobustness of the timetable a 5-15 minutes entry delay was simulated for every train in the planned work-day timetable. The conclusions of the simulation were later projected into specific dispatching issues for every station dispatcher as well as the overall operations control. Apparently thanks to the results of the study the influence of delays on this track was minimized. This was an important contribution to improve the marketing image of the new timetable.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
AP - Městské, oblastní a dopravní plánování
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2009
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Science & Military
ISSN
1336-8885
e-ISSN
—
Svazek periodika
4
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
SK - Slovenská republika
Počet stran výsledku
6
Strana od-do
—
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—