Evaluation of a Mobile Highway Management System at Roadwork Zones
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F22%3A00355548" target="_blank" >RIV/68407700:21260/22:00355548 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.5829/ije.2022.35.05b.06" target="_blank" >https://doi.org/10.5829/ije.2022.35.05b.06</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5829/ije.2022.35.05b.06" target="_blank" >10.5829/ije.2022.35.05b.06</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Evaluation of a Mobile Highway Management System at Roadwork Zones
Popis výsledku v původním jazyce
Road construction and maintenance activities cause traffic congestions and delays and present challenges for ensuring the safety of both motorists and road workers. While urban areas are well-equipped with traffic devices, in the case of highways our chances to collect traffic data and control traffic flows may be limited. Then the use of a temporary Highway Traffic Management System seems to be a suitable solution. Although the impacts of its deployment are addressed by many theoretical studies and demonstrated on traffic simulation models, there are not many references dealing with field tests. We provide results of the practical evaluation of the temporary Highway Management System installed and tested on the main highway in the Czech Republic during the road works period. Before-after analysis of collected traffic data was performed to prove the importance and positive impact of the proposed solution. We demonstrate an over 20% increase in the capacity of the roadwork zone and an almost 30 seconds decrease in average delay for one vehicle Highway administrators can use the results to justify investments into the temporary deployment of mobile traffic management systems.
Název v anglickém jazyce
Evaluation of a Mobile Highway Management System at Roadwork Zones
Popis výsledku anglicky
Road construction and maintenance activities cause traffic congestions and delays and present challenges for ensuring the safety of both motorists and road workers. While urban areas are well-equipped with traffic devices, in the case of highways our chances to collect traffic data and control traffic flows may be limited. Then the use of a temporary Highway Traffic Management System seems to be a suitable solution. Although the impacts of its deployment are addressed by many theoretical studies and demonstrated on traffic simulation models, there are not many references dealing with field tests. We provide results of the practical evaluation of the temporary Highway Management System installed and tested on the main highway in the Czech Republic during the road works period. Before-after analysis of collected traffic data was performed to prove the importance and positive impact of the proposed solution. We demonstrate an over 20% increase in the capacity of the roadwork zone and an almost 30 seconds decrease in average delay for one vehicle Highway administrators can use the results to justify investments into the temporary deployment of mobile traffic management systems.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
20104 - Transport engineering
Návaznosti výsledku
Projekt
—
Návaznosti
R - Projekt Ramcoveho programu EK
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
INTERNATIONAL JOURNAL OF ENGINEERING
ISSN
1025-2495
e-ISSN
—
Svazek periodika
35
Číslo periodika v rámci svazku
05
Stát vydavatele periodika
IR - Íránská islámská republika
Počet stran výsledku
8
Strana od-do
900-907
Kód UT WoS článku
000929773500005
EID výsledku v databázi Scopus
2-s2.0-85126279840