Transport Infrastructure Investment Project Portfolio Optimization Using a Cascade Approach to Solving the Min-Max Problem
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F22%3A00362768" target="_blank" >RIV/68407700:21260/22:00362768 - isvavai.cz</a>
Výsledek na webu
<a href="https://mme2022.vspj.cz/download/proceedings-4.pdf" target="_blank" >https://mme2022.vspj.cz/download/proceedings-4.pdf</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Transport Infrastructure Investment Project Portfolio Optimization Using a Cascade Approach to Solving the Min-Max Problem
Popis výsledku v původním jazyce
Transport infrastructure investment projects are usually very costly and time consuming. The limited capacity of resources does not allow the implementation of all prepared projects at the same time; therefore it is necessary to select a portfolio of projects for implementation. The selection must be made in such a way that not only the requirements of transport policy are met, but also the rules of the investment funds from which the projects are financed. The quality of the selected project portfolio is crucial due to their significant socio-economic impacts represented by indicators representing the usefulness of the buildings in the effective use of available funds. The aim of optimization is to minimize the maximal negative deviations from the minimum values of indicators representing the degree of non-fulfilment. The article presents one of the possible approaches to solving this problem based on linear programming with the addition of a cascade approach providing improved results.
Název v anglickém jazyce
Transport Infrastructure Investment Project Portfolio Optimization Using a Cascade Approach to Solving the Min-Max Problem
Popis výsledku anglicky
Transport infrastructure investment projects are usually very costly and time consuming. The limited capacity of resources does not allow the implementation of all prepared projects at the same time; therefore it is necessary to select a portfolio of projects for implementation. The selection must be made in such a way that not only the requirements of transport policy are met, but also the rules of the investment funds from which the projects are financed. The quality of the selected project portfolio is crucial due to their significant socio-economic impacts represented by indicators representing the usefulness of the buildings in the effective use of available funds. The aim of optimization is to minimize the maximal negative deviations from the minimum values of indicators representing the degree of non-fulfilment. The article presents one of the possible approaches to solving this problem based on linear programming with the addition of a cascade approach providing improved results.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
10102 - Applied mathematics
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
MME2022 : Proceedings of the 40th International Conference on Mathematical Methods in Economics
ISBN
978-80-88064-62-6
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
280-285
Název nakladatele
Vysoká škola polytechnická Jihlava
Místo vydání
Jihlava
Místo konání akce
Jihlava
Datum konání akce
7. 9. 2022
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000936355000044