Verification of Existing Reinforced Concrete Bridges using the Semi-Probabilistic Approach
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F13%3A00208353" target="_blank" >RIV/68407700:21610/13:00208353 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1016/j.engstruct.2013.07.015" target="_blank" >http://dx.doi.org/10.1016/j.engstruct.2013.07.015</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.engstruct.2013.07.015" target="_blank" >10.1016/j.engstruct.2013.07.015</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Verification of Existing Reinforced Concrete Bridges using the Semi-Probabilistic Approach
Popis výsledku v původním jazyce
At present existing bridges are mostly verified using simplified deterministic procedures. Application of the partial factors recommended for the design of construction works often yields conservative results and may lead to expensive repairs. More realistic verification of actual performance can be achieved using partial factors based on the semi-probabilistic approach in accordance with EN 1990 and ISO 2394. This method is easy to use and yet yields a well-balanced structural reliability. The presentstudy intends to clarify applications of the semi-probabilistic approach in verifications of existing reinforced concrete bridges. Numerical examples supplement general procedures and illustrate how the design values and partial factors can be derived for different target reliability levels and remaining working lives.
Název v anglickém jazyce
Verification of Existing Reinforced Concrete Bridges using the Semi-Probabilistic Approach
Popis výsledku anglicky
At present existing bridges are mostly verified using simplified deterministic procedures. Application of the partial factors recommended for the design of construction works often yields conservative results and may lead to expensive repairs. More realistic verification of actual performance can be achieved using partial factors based on the semi-probabilistic approach in accordance with EN 1990 and ISO 2394. This method is easy to use and yet yields a well-balanced structural reliability. The presentstudy intends to clarify applications of the semi-probabilistic approach in verifications of existing reinforced concrete bridges. Numerical examples supplement general procedures and illustrate how the design values and partial factors can be derived for different target reliability levels and remaining working lives.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Engineering Structures
ISSN
0141-0296
e-ISSN
—
Svazek periodika
56
Číslo periodika v rámci svazku
11
Stát vydavatele periodika
GB - Spojené království Velké Británie a Severního Irska
Počet stran výsledku
8
Strana od-do
1419-1426
Kód UT WoS článku
000329959600117
EID výsledku v databázi Scopus
—