Decision Making Support of Logistics Tasks in the Manufacturing System
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28140%2F14%3A43871486" target="_blank" >RIV/70883521:28140/14:43871486 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Decision Making Support of Logistics Tasks in the Manufacturing System
Popis výsledku v původním jazyce
The paper highlights the problem of the manufacturing system in which each machine is equipped with one dedicated tool not being subject to regeneration. Machines are situated within the reach of the robotic arm whose goal is to carry out transport operations of semi-products to the subsequent manufacturing machines in accordance with the determined timescale. Heuristic algorithms are implemented to control the order making process. Minimizing the order making time remains the basic criterion. It is assumed that making orders is carried out either along the determined manufacturing route in case of defining a sequence of manufacturing operations or, in case of not defining such a sequence, according to the determined sequence of operations by means ofa heuristic algorithm. The discussed logistic formation is treated as a serial manufacturing system in case of the determined sequence of manufacturing operations. The problem consists in time scaling manufacturing operations for the tran
Název v anglickém jazyce
Decision Making Support of Logistics Tasks in the Manufacturing System
Popis výsledku anglicky
The paper highlights the problem of the manufacturing system in which each machine is equipped with one dedicated tool not being subject to regeneration. Machines are situated within the reach of the robotic arm whose goal is to carry out transport operations of semi-products to the subsequent manufacturing machines in accordance with the determined timescale. Heuristic algorithms are implemented to control the order making process. Minimizing the order making time remains the basic criterion. It is assumed that making orders is carried out either along the determined manufacturing route in case of defining a sequence of manufacturing operations or, in case of not defining such a sequence, according to the determined sequence of operations by means ofa heuristic algorithm. The discussed logistic formation is treated as a serial manufacturing system in case of the determined sequence of manufacturing operations. The problem consists in time scaling manufacturing operations for the tran
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JD - Využití počítačů, robotika a její aplikace
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/ED2.1.00%2F03.0089" target="_blank" >ED2.1.00/03.0089: Centrum bezpečnostních, informačních a pokročilých technologií (CEBIA-Tech)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Conference Proceedings of 32nd International Conference Mathematical Methods in Economics
ISBN
978-80-244-4209-9
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
106-111
Název nakladatele
Univerzita Palackého
Místo vydání
Olomouc
Místo konání akce
Olomouc
Datum konání akce
10. 9. 2014
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—