Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F15%3A10318882" target="_blank" >RIV/00216208:11320/15:10318882 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.5220/0005215701190130" target="_blank" >http://dx.doi.org/10.5220/0005215701190130</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5220/0005215701190130" target="_blank" >10.5220/0005215701190130</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints
Popis výsledku v původním jazyce
One of the classical problems of real-life production scheduling is dynamics of manufacturing environ-ments with new production demands coming and breaking machines during the schedule execution. Simplerescheduling from scratch in response to unexpectedevents occurring on the shop ?oor may require exces-sive computation time. Moreover, the recovered schedule may be deviated prohibitively from the ongoingschedule. This paper studies two methods how to modify a schedule in response to a resource failure:right-shift of affected activities and simple temporal network recovery. The importance is put on the speed of therescheduling procedures as well as on the minimum deviation from the original schedule. The schedulingmodel is motivated by the FlowOpt project, which is based on Temporal Networks with Alternatives andsupports simple temporal constraints between the activities.
Název v anglickém jazyce
Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints
Popis výsledku anglicky
One of the classical problems of real-life production scheduling is dynamics of manufacturing environ-ments with new production demands coming and breaking machines during the schedule execution. Simplerescheduling from scratch in response to unexpectedevents occurring on the shop ?oor may require exces-sive computation time. Moreover, the recovered schedule may be deviated prohibitively from the ongoingschedule. This paper studies two methods how to modify a schedule in response to a resource failure:right-shift of affected activities and simple temporal network recovery. The importance is put on the speed of therescheduling procedures as well as on the minimum deviation from the original schedule. The schedulingmodel is motivated by the FlowOpt project, which is based on Temporal Networks with Alternatives andsupports simple temporal constraints between the activities.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
IN - Informatika
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
ICAART 2015 - Proceedings of the International Conference on Agents and Artificial Intelligence, Volume 2
ISBN
978-989-758-074-1
ISSN
—
e-ISSN
—
Počet stran výsledku
12
Strana od-do
119-130
Název nakladatele
Science and Technology Publications, Lda
Místo vydání
Setúbal, Portugal
Místo konání akce
Lisbon, Portugal
Datum konání akce
10. 1. 2015
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—