Machine Breakdown Recovery in Production Scheduling with Simple Temporal Constraints
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F15%3A10319183" target="_blank" >RIV/00216208:11320/15:10319183 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1007/978-3-319-27947-3_10" target="_blank" >http://dx.doi.org/10.1007/978-3-319-27947-3_10</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-3-319-27947-3_10" target="_blank" >10.1007/978-3-319-27947-3_10</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Machine Breakdown Recovery in Production Scheduling with Simple Temporal Constraints
Popis výsledku v původním jazyce
One of the problems of real-life production scheduling is dynamics of manufacturing environments with new production demands coming and breaking machines during the schedule execution. Simple rescheduling from scratch in response to unexpected events mayrequire excessive computation time. Moreover, the recovered schedule may deviate prohibitively from the ongoing schedule. This paper studies two methods how to modify a schedule in response to a machine breakdown: right-shift of affected activities andsimple temporal network recovery. The importance is put on the speed of the rescheduling procedures as well as on the minimum deviation from the original schedule. In addition, this paper models the problem as a Mixed Integer Program and compares the proposed algorithms to the model using the mosek optimizer. The scheduling model is motivated by the FlowOpt project, which is based on Temporal Networks with Alternatives and supports simple temporal constraints between the activities.
Název v anglickém jazyce
Machine Breakdown Recovery in Production Scheduling with Simple Temporal Constraints
Popis výsledku anglicky
One of the problems of real-life production scheduling is dynamics of manufacturing environments with new production demands coming and breaking machines during the schedule execution. Simple rescheduling from scratch in response to unexpected events mayrequire excessive computation time. Moreover, the recovered schedule may deviate prohibitively from the ongoing schedule. This paper studies two methods how to modify a schedule in response to a machine breakdown: right-shift of affected activities andsimple temporal network recovery. The importance is put on the speed of the rescheduling procedures as well as on the minimum deviation from the original schedule. In addition, this paper models the problem as a Mixed Integer Program and compares the proposed algorithms to the model using the mosek optimizer. The scheduling model is motivated by the FlowOpt project, which is based on Temporal Networks with Alternatives and supports simple temporal constraints between the activities.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
IN - Informatika
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GA15-19877S" target="_blank" >GA15-19877S: Automatické modelování znalostí a plánů pro autonomní roboty</a><br>
Návaznosti
S - Specificky vyzkum na vysokych skolach<br>I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Agents and Artificial Intelligence 7th International Conference, ICAART 2015,Revised Selected Papers
ISBN
978-3-319-27946-6
ISSN
0302-9743
e-ISSN
—
Počet stran výsledku
22
Strana od-do
185-206
Název nakladatele
Springer International Publishing
Místo vydání
Switzerland
Místo konání akce
Lisbon, Portugal
Datum konání akce
10. 1. 2015
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—