Full-scale tests of temporary steel (foot)bridges
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F15%3APU118775" target="_blank" >RIV/00216305:26110/15:PU118775 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Full-scale tests of temporary steel (foot)bridges
Popis výsledku v původním jazyce
The paper is focused on the problems of tests of steel structures intended for the temporary bridges and footbridges. On authors’ workplace, full-scale tests of existing railway temporary steel bridge and recently developed temporary steel footbridges have been performed. For the experimental verification of the railway temporary steel bridge in the real size the effective testing method non-requiring the fixed testing equipment anchored to the ground has been applied. In the case of newly developed temporary steel footbridges, the traditional loading methodology using the ballast load has been applied. The span of tested railway temporary bridge was 18 m and the spans of tested prototypes of newly developed temporary footbridges were 18 m and 36 m. The results of experimental verifications are the important information about the behaviour of real structures giving data of actual stresses, stiffness, deformations including the influence of individual structural parts and components on these, and can provide the backgrounds for the verification and correction of the calculating and evaluating procedures based on the usual analytical methods and numerical models.
Název v anglickém jazyce
Full-scale tests of temporary steel (foot)bridges
Popis výsledku anglicky
The paper is focused on the problems of tests of steel structures intended for the temporary bridges and footbridges. On authors’ workplace, full-scale tests of existing railway temporary steel bridge and recently developed temporary steel footbridges have been performed. For the experimental verification of the railway temporary steel bridge in the real size the effective testing method non-requiring the fixed testing equipment anchored to the ground has been applied. In the case of newly developed temporary steel footbridges, the traditional loading methodology using the ballast load has been applied. The span of tested railway temporary bridge was 18 m and the spans of tested prototypes of newly developed temporary footbridges were 18 m and 36 m. The results of experimental verifications are the important information about the behaviour of real structures giving data of actual stresses, stiffness, deformations including the influence of individual structural parts and components on these, and can provide the backgrounds for the verification and correction of the calculating and evaluating procedures based on the usual analytical methods and numerical models.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Recent Advances in Mechanics and Materials in Design
ISBN
978-989-98832-2-2
ISSN
—
e-ISSN
—
Počet stran výsledku
13
Strana od-do
305-317
Název nakladatele
University of Porto
Místo vydání
Ponta Delgada, Azores, Portugal
Místo konání akce
Ponta Delgada
Datum konání akce
26. 7. 2015
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000378595500070