Optimization of Process Field Measurement GNSS-RTK for Railway Infrastructure
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F16%3APU121235" target="_blank" >RIV/00216305:26110/16:PU121235 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.scientific.net/SSP.258.481" target="_blank" >http://www.scientific.net/SSP.258.481</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.4028/www.scientific.net/SSP.258.481" target="_blank" >10.4028/www.scientific.net/SSP.258.481</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Optimization of Process Field Measurement GNSS-RTK for Railway Infrastructure
Popis výsledku v původním jazyce
The paper describes measurements in field on points of railway control by the GNSS-RTK method. In the model each of these points can be represented by node in graph and evaluation of graph edges corresponds to the distance between individual nodes. The task is to measure on every node even one times and to absolve the total route with minimal sum of distance. In fact it is searching of the Hamilton's path in a graph. The situation is complicated because the conditions for GNSS-RTK surveying in nodes are suitable only at certain time intervals during the day. Generally the above mentioned task is NP - completely problem, which is solved in the practice in many cases by heuristic methods. The authors proposed the optimization method based on Floyd algorithm and dynamic data structure - event list. The optimization of field measurement solves the time demands and brings economic effectiveness. The algorithm was implemented in Borland Delphi environment.
Název v anglickém jazyce
Optimization of Process Field Measurement GNSS-RTK for Railway Infrastructure
Popis výsledku anglicky
The paper describes measurements in field on points of railway control by the GNSS-RTK method. In the model each of these points can be represented by node in graph and evaluation of graph edges corresponds to the distance between individual nodes. The task is to measure on every node even one times and to absolve the total route with minimal sum of distance. In fact it is searching of the Hamilton's path in a graph. The situation is complicated because the conditions for GNSS-RTK surveying in nodes are suitable only at certain time intervals during the day. Generally the above mentioned task is NP - completely problem, which is solved in the practice in many cases by heuristic methods. The authors proposed the optimization method based on Floyd algorithm and dynamic data structure - event list. The optimization of field measurement solves the time demands and brings economic effectiveness. The algorithm was implemented in Borland Delphi environment.
Klasifikace
Druh
J<sub>SC</sub> - Článek v periodiku v databázi SCOPUS
CEP obor
—
OECD FORD obor
10508 - Physical geography
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Solid State Phenomena
ISSN
1012-0394
e-ISSN
—
Svazek periodika
B
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
CH - Švýcarská konfederace
Počet stran výsledku
4
Strana od-do
481-484
Kód UT WoS článku
—
EID výsledku v databázi Scopus
2-s2.0-85009786095