Method of the Short Time Additional Earthing of Healthy Phase for Localization of The Earth Fault
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F13%3APU105837" target="_blank" >RIV/00216305:26220/13:PU105837 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Method of the Short Time Additional Earthing of Healthy Phase for Localization of The Earth Fault
Popis výsledku v původním jazyce
This paper presents analyze of the data measured during the real network experiments. The experiments were focused on localization of earth faults in compensated 22 kV network by means of healthy phase additional earthing method. Principle of this methodis intentionally connecting of healthy phase to earth for very short time during the earth fault. Thus the two phase short circuit is created in the fault feeder and the location of short circuit can be determined by distance protection. Whole the localization process must be very fast to avoid the trip of overcurrent protection in faulted feeder due to short circuit current. The experiments have been performed in 22 kV distribution network in the end of last year. Earth fault was created in two different sites and additional earthing of healthy phase was realized by specialized circuit breaker installed in 22 kV switchgear of transformation substation. Due to the evaluation of measuring data from above mentioned experiments we can pro
Název v anglickém jazyce
Method of the Short Time Additional Earthing of Healthy Phase for Localization of The Earth Fault
Popis výsledku anglicky
This paper presents analyze of the data measured during the real network experiments. The experiments were focused on localization of earth faults in compensated 22 kV network by means of healthy phase additional earthing method. Principle of this methodis intentionally connecting of healthy phase to earth for very short time during the earth fault. Thus the two phase short circuit is created in the fault feeder and the location of short circuit can be determined by distance protection. Whole the localization process must be very fast to avoid the trip of overcurrent protection in faulted feeder due to short circuit current. The experiments have been performed in 22 kV distribution network in the end of last year. Earth fault was created in two different sites and additional earthing of healthy phase was realized by specialized circuit breaker installed in 22 kV switchgear of transformation substation. Due to the evaluation of measuring data from above mentioned experiments we can pro
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 7th International Scientific Symposium on Electrical Power Engineering
ISBN
978-80-553-1441-9
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
463-465
Název nakladatele
Neuveden
Místo vydání
Košice
Místo konání akce
Stará Lesná
Datum konání akce
18. 9. 2013
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—