The Evaluation of Overvoltage During Short-Time Additional Earthing of Healthy Phase for Fault Location in MV Networks
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F14%3APU108900" target="_blank" >RIV/00216305:26220/14:PU108900 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1049/cp.2014.0160" target="_blank" >http://dx.doi.org/10.1049/cp.2014.0160</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1049/cp.2014.0160" target="_blank" >10.1049/cp.2014.0160</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Evaluation of Overvoltage During Short-Time Additional Earthing of Healthy Phase for Fault Location in MV Networks
Popis výsledku v původním jazyce
The paper is focused on the operational experience with an automatic system for additional earthing of the faulty or healthy phase during an earth fault. The system is primarily used for limiting of a fault current in the point of the fault by earthing of the faulty phase during an earth fault. The equipment for additional earthing of faulty phase can also be used for short-time connection of healthy phase to earth fault location. There are fast circuit breakers for additional earthing in the substation and the cycle close-open is shorter then time for tripping of overcurrent protection in the outgoing feeder-bay (100 ms). This method of fault location in MV network could bring additional overvoltage which stresses the insulation of MV networks elements. This paper presents the simulation and experimental verification of this phenomenon and gives the recommendation for choosing the healthy phase for minimizing the negative influence of this location technique.
Název v anglickém jazyce
The Evaluation of Overvoltage During Short-Time Additional Earthing of Healthy Phase for Fault Location in MV Networks
Popis výsledku anglicky
The paper is focused on the operational experience with an automatic system for additional earthing of the faulty or healthy phase during an earth fault. The system is primarily used for limiting of a fault current in the point of the fault by earthing of the faulty phase during an earth fault. The equipment for additional earthing of faulty phase can also be used for short-time connection of healthy phase to earth fault location. There are fast circuit breakers for additional earthing in the substation and the cycle close-open is shorter then time for tripping of overcurrent protection in the outgoing feeder-bay (100 ms). This method of fault location in MV network could bring additional overvoltage which stresses the insulation of MV networks elements. This paper presents the simulation and experimental verification of this phenomenon and gives the recommendation for choosing the healthy phase for minimizing the negative influence of this location technique.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20704 - Energy and fuels
Návaznosti výsledku
Projekt
<a href="/cs/project/EE2.3.30.0005" target="_blank" >EE2.3.30.0005: Podpora tvorby excelentních týmů mezioborového výzkumu na VUT</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
The 12th International Conference on Developments in Power System Protection DPSP2014
ISBN
978-1-84919-834-9
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
1-6
Název nakladatele
The Institution of Engineering and Technology IET
Místo vydání
Six Hills Way Stevenage Hertfordshire SG1 2AY UK
Místo konání akce
Copenhagen
Datum konání akce
31. 3. 2014
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—