The Earth Fault Location Method Based on Additional Earthing of Healthy Phase in Compensated Networks
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F14%3APU111149" target="_blank" >RIV/00216305:26220/14:PU111149 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Earth Fault Location Method Based on Additional Earthing of Healthy Phase in Compensated Networks
Popis výsledku v původním jazyce
This paper is focused on localization of an earth fault using short-time additional earthing of unaffected (healthy) phase in supply substation. This method uses additional second earth fault, which is created in supply substation, to increase the faultcurrent level for calculating the line reactance (distance) to fault point by a fault locator installed in outgoing feeder. Duration of this additional earth fault varies from 100 to 200 ms and is limited to value given by the time setting of overcurrentprotection. The functionality of the method was verified during field tests, which were performed in the actual distribution network where the automatic for additional earthing is installed under pilot project. In the paper, function of the method and realized experimental measurements are described, as well the accuracy of calculated distance to fault point is evaluated for solid, resistive and arcing earth fault for ideally compensated, overcompensated and undercompensated state of MV
Název v anglickém jazyce
The Earth Fault Location Method Based on Additional Earthing of Healthy Phase in Compensated Networks
Popis výsledku anglicky
This paper is focused on localization of an earth fault using short-time additional earthing of unaffected (healthy) phase in supply substation. This method uses additional second earth fault, which is created in supply substation, to increase the faultcurrent level for calculating the line reactance (distance) to fault point by a fault locator installed in outgoing feeder. Duration of this additional earth fault varies from 100 to 200 ms and is limited to value given by the time setting of overcurrentprotection. The functionality of the method was verified during field tests, which were performed in the actual distribution network where the automatic for additional earthing is installed under pilot project. In the paper, function of the method and realized experimental measurements are described, as well the accuracy of calculated distance to fault point is evaluated for solid, resistive and arcing earth fault for ideally compensated, overcompensated and undercompensated state of MV
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/EE2.3.30.0005" target="_blank" >EE2.3.30.0005: Podpora tvorby excelentních týmů mezioborového výzkumu na VUT</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
CIDEL Argentina 2014, International Conference on Electricity Distribution
ISBN
978-987-97399-6-9
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
1-6
Název nakladatele
CIDEL 2014
Místo vydání
Buenos Aires, Argentina
Místo konání akce
Buenos Aires
Datum konání akce
22. 9. 2014
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—