The Influence of Additional Earthing of Healthy Phase for Earth Fault Location on Overvoltage in Distribution Networks
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F14%3APU112429" target="_blank" >RIV/00216305:26220/14:PU112429 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Influence of Additional Earthing of Healthy Phase for Earth Fault Location on Overvoltage in Distribution Networks
Popis výsledku v původním jazyce
The Czech MV compensated networks operated by distribution system operator E.ON are not switched off immediately in the case of earth fault. In such cases, there is real risk of hazard voltages around faulty place. Therefore automatic for additional earthing of faulty phase is installed under pilot project in one supply substation 22kV. This automatic can be also used for short-time connection (100 ms) of healthy phase to earthing system of supply substation that leads to double line-to-earth short circuit which increase level of fault current to value which is sufficient for calculation of the fault distance by fault locator installed in outgoing feeder. As performed field tests showed, this operation can caused high overvoltage up to 200 % of operation voltage, therefore the paper gives the recommendation for choosing of the healthy phase for minimizing the overvoltage during this location technique.
Název v anglickém jazyce
The Influence of Additional Earthing of Healthy Phase for Earth Fault Location on Overvoltage in Distribution Networks
Popis výsledku anglicky
The Czech MV compensated networks operated by distribution system operator E.ON are not switched off immediately in the case of earth fault. In such cases, there is real risk of hazard voltages around faulty place. Therefore automatic for additional earthing of faulty phase is installed under pilot project in one supply substation 22kV. This automatic can be also used for short-time connection (100 ms) of healthy phase to earthing system of supply substation that leads to double line-to-earth short circuit which increase level of fault current to value which is sufficient for calculation of the fault distance by fault locator installed in outgoing feeder. As performed field tests showed, this operation can caused high overvoltage up to 200 % of operation voltage, therefore the paper gives the recommendation for choosing of the healthy phase for minimizing the overvoltage during this location technique.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/LO1210" target="_blank" >LO1210: Energie v podmínkách udržitelného rozvoje (EN-PUR)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
CIDEL Argentina 2014, International Conference on Electricity Distribution
ISBN
978-987-97399-6-9
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
1-7
Název nakladatele
CIDEL 2014
Místo vydání
Buenos Aires, Argentina
Místo konání akce
Buenos Aires
Datum konání akce
22. 9. 2014
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—