Methodology for the use of railML format in IS SŽ, Solution designs – groundwork for use case TRGE
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F25312936%3A_____%2F20%3AN0000002" target="_blank" >RIV/25312936:_____/20:N0000002 - isvavai.cz</a>
Výsledek na webu
<a href="http://kpmconsult.cz/reference" target="_blank" >http://kpmconsult.cz/reference</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Methodology for the use of railML format in IS SŽ, Solution designs – groundwork for use case TRGE
Popis výsledku v původním jazyce
This workshop is represented as a long-term international cooperation on the use case “Track Geometry” (TRGE) solution, announced by the RailML consortium and further developed in cooperation with SŽ´s (Railway Administration) Railway Geodetics Administration experts, the RailML consortium specialists and the TAČR TL02000312 project solvers. In addition to the actual proposals for the conversion of the content of the data used for these purposes within the SŽ into XSD structures of railML v. 3.2, which were summarized in the form of the RML-5 report, marked identically as the name of the workshop, it also included the joint participation of all solvers in workshops oriented on explaining railML functionalities organized by the RailML consortium and a number of videoconferences. The final interval of work on the RML-5 report is given as the date of the workshop, which ended with a joint meeting of the team, which took place in Prague on 6.3.2020. Further work was suspended both due to the COVID pandemic and due to the interruption of RailML's focus on BIM tasks.
Název v anglickém jazyce
Methodology for the use of railML format in IS SŽ, Solution designs – groundwork for use case TRGE
Popis výsledku anglicky
This workshop is represented as a long-term international cooperation on the use case “Track Geometry” (TRGE) solution, announced by the RailML consortium and further developed in cooperation with SŽ´s (Railway Administration) Railway Geodetics Administration experts, the RailML consortium specialists and the TAČR TL02000312 project solvers. In addition to the actual proposals for the conversion of the content of the data used for these purposes within the SŽ into XSD structures of railML v. 3.2, which were summarized in the form of the RML-5 report, marked identically as the name of the workshop, it also included the joint participation of all solvers in workshops oriented on explaining railML functionalities organized by the RailML consortium and a number of videoconferences. The final interval of work on the RML-5 report is given as the date of the workshop, which ended with a joint meeting of the team, which took place in Prague on 6.3.2020. Further work was suspended both due to the COVID pandemic and due to the interruption of RailML's focus on BIM tasks.
Klasifikace
Druh
W - Uspořádání workshopu
CEP obor
—
OECD FORD obor
20104 - Transport engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/TL02000312" target="_blank" >TL02000312: Lokalizace a implementace metodiky RailTopoModel a značkovacího jazyka railML v. 3 do podmínek prostorového popisu železničních drah v ČR s přihlédnutím k aplikaci metodiky BIM</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2020
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Místo konání akce
Praha, videokonference
Stát konání akce
CZ - Česká republika
Datum zahájení akce
—
Datum ukončení akce
—
Celkový počet účastníků
8
Počet zahraničních účastníků
2
Typ akce podle státní přísl. účastníků
EUR - Evropská akce