Simultaneous Control Loop Performance Assessment and Process Identification Based on Fractional Models
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23520%2F15%3A43926652" target="_blank" >RIV/49777513:23520/15:43926652 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.sciencedirect.com/science/article/pii/S2405896315011581" target="_blank" >http://www.sciencedirect.com/science/article/pii/S2405896315011581</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.ifacol.2015.09.077" target="_blank" >10.1016/j.ifacol.2015.09.077</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Simultaneous Control Loop Performance Assessment and Process Identification Based on Fractional Models
Popis výsledku v původním jazyce
Control loop performance assessment procedures are established as key cornerstone of process optimization and monitoring. Unfortunately, many methods do not consider the maximum possible performance which can be achieved by the fixed structure controller installed in the loop (typically PID). In authors' recent work such method was described. It was shown that - with respect to classical minimum variance method - the maximum performance is strongly influenced by the process normalized dead time. Consequently, the process model should be re-estimated during the plant operation. This paper describes technique which integrates continuous estimation of process model including normalized dead-time and control loop performance assessment. The process model is considered as fractional in order to fit well to distributed parameter systems appearing in chemical process control industries. All procedures are packed into advanced function blocks which are ready for real-time applications.
Název v anglickém jazyce
Simultaneous Control Loop Performance Assessment and Process Identification Based on Fractional Models
Popis výsledku anglicky
Control loop performance assessment procedures are established as key cornerstone of process optimization and monitoring. Unfortunately, many methods do not consider the maximum possible performance which can be achieved by the fixed structure controller installed in the loop (typically PID). In authors' recent work such method was described. It was shown that - with respect to classical minimum variance method - the maximum performance is strongly influenced by the process normalized dead time. Consequently, the process model should be re-estimated during the plant operation. This paper describes technique which integrates continuous estimation of process model including normalized dead-time and control loop performance assessment. The process model is considered as fractional in order to fit well to distributed parameter systems appearing in chemical process control industries. All procedures are packed into advanced function blocks which are ready for real-time applications.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20205 - Automation and control systems
Návaznosti výsledku
Projekt
<a href="/cs/project/TA02010152" target="_blank" >TA02010152: Nové metody pro monitorování, ohodnocování a optimalizaci kvality regulace a jejich implementace do řídicího systému ZAT Plant Suite</a><br>
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
IFAC Proceedings Volumes (IFAC-PapersOnline)
ISBN
—
ISSN
2405-8963
e-ISSN
—
Počet stran výsledku
6
Strana od-do
859-864
Název nakladatele
IFAC
Místo vydání
Neuveden
Místo konání akce
Whistler, Canada
Datum konání akce
7. 6. 2015
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000375842300145