A three-stage experimental constructed wetland for treatment of domestic sewage: First 2 years of operation
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41330%2F11%3A51660" target="_blank" >RIV/60460709:41330/11:51660 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/25173154:_____/11:#0000219
Výsledek na webu
<a href="http://dx.doi.org/10.1016/j.ecoleng.2010.03.004" target="_blank" >http://dx.doi.org/10.1016/j.ecoleng.2010.03.004</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.ecoleng.2010.03.004" target="_blank" >10.1016/j.ecoleng.2010.03.004</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
A three-stage experimental constructed wetland for treatment of domestic sewage: First 2 years of operation
Popis výsledku v původním jazyce
Hybrid constructed wetland systems have recently been used to treat wastewaters where high demand for removal of ammonia is required. The paper evaluates the efficiency of a three-stage constructed wetland system consisting of saturated vertical-flow (VF)bed, free-drained VF bed and horizontal-flow bed in series. The experimental sysem was located in Trebon at the municipal wastewater treatment plant. The results proved very high efficiency - removal of BOD5 and COD amounted to 94.5% and 84.4%, respectively,with respective average outflow concentrations of 10 and 50 mg/l. The inflow mean NH4-N concentration of 29.9 mg/l was reduced to 6.5 mg/l with the average removal efficiency of 78.3%.
Název v anglickém jazyce
A three-stage experimental constructed wetland for treatment of domestic sewage: First 2 years of operation
Popis výsledku anglicky
Hybrid constructed wetland systems have recently been used to treat wastewaters where high demand for removal of ammonia is required. The paper evaluates the efficiency of a three-stage constructed wetland system consisting of saturated vertical-flow (VF)bed, free-drained VF bed and horizontal-flow bed in series. The experimental sysem was located in Trebon at the municipal wastewater treatment plant. The results proved very high efficiency - removal of BOD5 and COD amounted to 94.5% and 84.4%, respectively,with respective average outflow concentrations of 10 and 50 mg/l. The inflow mean NH4-N concentration of 29.9 mg/l was reduced to 6.5 mg/l with the average removal efficiency of 78.3%.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
DJ - Znečištění a kontrola vody
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/ME%20876" target="_blank" >ME 876: Využití umělých mokřadů s přerušovaným vertikálním průtokem pro čištění odpadních vod</a><br>
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Ecological Engineering
ISSN
0925-8574
e-ISSN
—
Svazek periodika
37
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
9
Strana od-do
90-98
Kód UT WoS článku
000287464400009
EID výsledku v databázi Scopus
—