Allocation of Trains to Platforms Optimization
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27230%2F12%3A86083485" target="_blank" >RIV/61989100:27230/12:86083485 - isvavai.cz</a>
Výsledek na webu
<a href="http://mme2012.opf.slu.cz/proceedings/proceedings.php" target="_blank" >http://mme2012.opf.slu.cz/proceedings/proceedings.php</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Allocation of Trains to Platforms Optimization
Popis výsledku v původním jazyce
An important part of a transport market is a railway transport. A train traffic diagram is a key element of an operational implementation of a railway traffic. A track occupancy plan is its annex, which specifies a schedule of trains staying on tracks byplatforms in the particular railway station. A track occupancy plan is an important tool for the dispatcher helping him allocate trains to platforms. Unfortunately in the Czech and Slovak Republic planning train movements within the station is done by hand, using planner?s experience and a set of rules determined by a railway company. This article deals with constructing a track occupancy plan in the railway station using modern computational methods for its automatic creation based on the entered input data (the daily timetable and the structural and operational constraints). The linear mathematical model is introduced, the meaningful optimization criterion is designed and the constraints are formulated. The problem of allocation of t
Název v anglickém jazyce
Allocation of Trains to Platforms Optimization
Popis výsledku anglicky
An important part of a transport market is a railway transport. A train traffic diagram is a key element of an operational implementation of a railway traffic. A track occupancy plan is its annex, which specifies a schedule of trains staying on tracks byplatforms in the particular railway station. A track occupancy plan is an important tool for the dispatcher helping him allocate trains to platforms. Unfortunately in the Czech and Slovak Republic planning train movements within the station is done by hand, using planner?s experience and a set of rules determined by a railway company. This article deals with constructing a track occupancy plan in the railway station using modern computational methods for its automatic creation based on the entered input data (the daily timetable and the structural and operational constraints). The linear mathematical model is introduced, the meaningful optimization criterion is designed and the constraints are formulated. The problem of allocation of t
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JO - Pozemní dopravní systémy a zařízení
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of 30th International Conference Mathematical Methods in Economics : 11-13 September 2012, Karviná, Czech Republic
ISBN
978-80-7248-779-0
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
478 - 483
Název nakladatele
Slezská univerzita v Opavě
Místo vydání
Opava
Místo konání akce
Karviná
Datum konání akce
11. 9. 2012
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—