Analyzing the Change Orders Impact on Building Projects
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00309100" target="_blank" >RIV/68407700:21110/16:00309100 - isvavai.cz</a>
Výsledek na webu
<a href="http://medwelljournals.com/" target="_blank" >http://medwelljournals.com/</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3923/jeasci.2016.1532.1537" target="_blank" >10.3923/jeasci.2016.1532.1537</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Analyzing the Change Orders Impact on Building Projects
Popis výsledku v původním jazyce
Many studies have tried to determine the causes and impacts of change orders on the cost and time of the project which in turn leads to differences and disputes between contractors and owners who dealt with change orders in various engineering projects. This search displayed the causes of formal change orders occurring during life cycle the building project and its most important impacts on performance of the project through its indicators. The search also showed that the owner has 60% of responsibility for the change orders and provided recommendations for each of the responsible parties (owner, designer) according to the causes coming by him. Stressing the need to monitor performance in order to manage change orders and address the causes and decreasing the impact where the time overruns caused by formal change orders is 29% and the cost overrun caused by change order is 31%. The prediction models were drafted at additional cost that may result from change orders; it showed that there is a positive relation shape between the change orders and the cost overruns. (The sample studied of projects is a random sample of buildings projects in Syria). Changes control and reduction can minimize the excess of the cost and lost time and paid the projects to better results in the future.
Název v anglickém jazyce
Analyzing the Change Orders Impact on Building Projects
Popis výsledku anglicky
Many studies have tried to determine the causes and impacts of change orders on the cost and time of the project which in turn leads to differences and disputes between contractors and owners who dealt with change orders in various engineering projects. This search displayed the causes of formal change orders occurring during life cycle the building project and its most important impacts on performance of the project through its indicators. The search also showed that the owner has 60% of responsibility for the change orders and provided recommendations for each of the responsible parties (owner, designer) according to the causes coming by him. Stressing the need to monitor performance in order to manage change orders and address the causes and decreasing the impact where the time overruns caused by formal change orders is 29% and the cost overrun caused by change order is 31%. The prediction models were drafted at additional cost that may result from change orders; it showed that there is a positive relation shape between the change orders and the cost overruns. (The sample studied of projects is a random sample of buildings projects in Syria). Changes control and reduction can minimize the excess of the cost and lost time and paid the projects to better results in the future.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Journal of Engineering and Applied Sciences
ISSN
1816-949X
e-ISSN
—
Svazek periodika
2016(11)
Číslo periodika v rámci svazku
7
Stát vydavatele periodika
PK - Pákistánská islámská republika
Počet stran výsledku
6
Strana od-do
1532-1537
Kód UT WoS článku
—
EID výsledku v databázi Scopus
2-s2.0-85007013765