Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F13%3A00211280" target="_blank" >RIV/68407700:21230/13:00211280 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem
Popis výsledku v původním jazyce
In order to improve the functionality and efficiency of industrial monitoring and control systems, the industries are looking toward ZigBee protocol, especially in environments where electricity is not available. We model the problem by a cyclic dependence graph with uniform constraints is to be scheduled so that some tasks are grouped in order to save energy. In this paper, we investigate the special case where the structure of the cyclic precedence graph is reduced to a collection of independent cycles, and where the grouping follows a topological structure of a chain or a tree (like in Zigbee). We show that a necessary condition that can be checked in polynomial time can also be stated and we propose an integer linear program to model the problem.
Název v anglickém jazyce
Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem
Popis výsledku anglicky
In order to improve the functionality and efficiency of industrial monitoring and control systems, the industries are looking toward ZigBee protocol, especially in environments where electricity is not available. We model the problem by a cyclic dependence graph with uniform constraints is to be scheduled so that some tasks are grouped in order to save energy. In this paper, we investigate the special case where the structure of the cyclic precedence graph is reduced to a collection of independent cycles, and where the grouping follows a topological structure of a chain or a tree (like in Zigbee). We show that a necessary condition that can be checked in polynomial time can also be stated and we propose an integer linear program to model the problem.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
BC - Teorie a systémy řízení
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GAP103%2F12%2F1994" target="_blank" >GAP103/12/1994: Adaptivní algoritmy pro rozvrhování a optimalizaci distribuovaných vestavěných real-time systémů</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů