Minimising Number of Shunting Tracks at Tram Turning Loops
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F20%3A00351543" target="_blank" >RIV/68407700:21260/20:00351543 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/61989100:27230/20:10245787
Výsledek na webu
<a href="https://mme2020.mendelu.cz/wcd/w-rek-mme/mme2020_conference_proceedings_final_final.pdf" target="_blank" >https://mme2020.mendelu.cz/wcd/w-rek-mme/mme2020_conference_proceedings_final_final.pdf</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Minimising Number of Shunting Tracks at Tram Turning Loops
Popis výsledku v původním jazyce
Tram transport infrastructure and its subsequent operation is a very costly matter for each transport operator. It is therefore purposeful for the infrastructure to be built only to the extent which is necessary. The article deals with the optimisation of the necessary number of shunting tracks under predefined volume of tram transport which is given by the number of tram lines and a frequency of their connections. This is a problem that is specific to rail transport, when changing the order of individual vehicles is organizationally complicated and is feasible only with appropriate construction of the rail yard (so called turning loops), in some cases it is not possible at all. One of the ways how to reduce the number of necessary shunting tracks at tram turning loops is to adjust the arrival and departure times of tram vehicles serving the individual lines - time coordination. Mathematical programming will be used to deal with the problem.
Název v anglickém jazyce
Minimising Number of Shunting Tracks at Tram Turning Loops
Popis výsledku anglicky
Tram transport infrastructure and its subsequent operation is a very costly matter for each transport operator. It is therefore purposeful for the infrastructure to be built only to the extent which is necessary. The article deals with the optimisation of the necessary number of shunting tracks under predefined volume of tram transport which is given by the number of tram lines and a frequency of their connections. This is a problem that is specific to rail transport, when changing the order of individual vehicles is organizationally complicated and is feasible only with appropriate construction of the rail yard (so called turning loops), in some cases it is not possible at all. One of the ways how to reduce the number of necessary shunting tracks at tram turning loops is to adjust the arrival and departure times of tram vehicles serving the individual lines - time coordination. Mathematical programming will be used to deal with the problem.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
10102 - Applied mathematics
Návaznosti výsledku
Projekt
<a href="/cs/project/CK01000043" target="_blank" >CK01000043: Systém pro podporu síťové časové koordinace spojů v přestupních uzlech</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2020
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proccedings of 38th Int. Conf. MME 2020
ISBN
978-80-7509-734-7
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
585-591
Název nakladatele
Provozně ekonomická fakulta
Místo vydání
Brno
Místo konání akce
Brno
Datum konání akce
9. 9. 2020
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000668460800089