MULTISTAGE RISK PREMIUMS IN PORTFOLIO OPTIMIZATION
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F17%3A10384588" target="_blank" >RIV/00216208:11320/17:10384588 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.14736/kyb-2017-6-0992" target="_blank" >https://doi.org/10.14736/kyb-2017-6-0992</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.14736/kyb-2017-6-0992" target="_blank" >10.14736/kyb-2017-6-0992</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
MULTISTAGE RISK PREMIUMS IN PORTFOLIO OPTIMIZATION
Popis výsledku v původním jazyce
This paper deals with a multistage stochastic programming portfolio selection problem with a new type of risk premium constraints. These risk premiums are constructed on the multistage scenario tree. Two ways of the construction are introduced and compared. The risk premiums are incorporated in the multistage stochastic programming portfolio selection problem. The problem maximizes the multivariate (multiperiod) utility function under condition that the multistage risk premiums are smaller than a prescribed level. The problem does not assume any separability of the multiperiod utility function. The performance of the suggested models is demonstrated for several kinds of multiperiod utility functions and several formulations of the multistage risk premium constraints. In all cases, including the risk premium constraints avoids the riskier positions.
Název v anglickém jazyce
MULTISTAGE RISK PREMIUMS IN PORTFOLIO OPTIMIZATION
Popis výsledku anglicky
This paper deals with a multistage stochastic programming portfolio selection problem with a new type of risk premium constraints. These risk premiums are constructed on the multistage scenario tree. Two ways of the construction are introduced and compared. The risk premiums are incorporated in the multistage stochastic programming portfolio selection problem. The problem maximizes the multivariate (multiperiod) utility function under condition that the multistage risk premiums are smaller than a prescribed level. The problem does not assume any separability of the multiperiod utility function. The performance of the suggested models is demonstrated for several kinds of multiperiod utility functions and several formulations of the multistage risk premium constraints. In all cases, including the risk premium constraints avoids the riskier positions.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
10103 - Statistics and probability
Návaznosti výsledku
Projekt
<a href="/cs/project/GBP402%2F12%2FG097" target="_blank" >GBP402/12/G097: DYME-Dynamické modely v ekonomii</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Kybernetika
ISSN
0023-5954
e-ISSN
—
Svazek periodika
53
Číslo periodika v rámci svazku
6
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
20
Strana od-do
992-1011
Kód UT WoS článku
000424732300003
EID výsledku v databázi Scopus
2-s2.0-85040727214