The development and testing of a new type of the temporary steel truss footbridge with closed cross-section
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F15%3APU113707" target="_blank" >RIV/00216305:26110/15:PU113707 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The development and testing of a new type of the temporary steel truss footbridge with closed cross-section
Popis výsledku v původním jazyce
In this paper there is some particular information about the development of a new sort of a temporary modular steel footbridge for pedestrians and cyclist, which was designed as a truss system with the deck below the supports and with the closed cross-section. Actually, this development was connected to the research project, which was one of the several ones from the recent period, where they all were focused on temporary steel footbridges design, developing and testing (including full-scale testing) and which were realized on our workplace in cooperation with research centres and companies. In this case the new footbridge has a span 18 - 36 m and it is divided into 3.0 m long assembly units. They were selected some its details for the loading tests and finally it was performed also a test of the prototype. Therefore, this paper brings the results of those experiments as well as some particular conclusions.
Název v anglickém jazyce
The development and testing of a new type of the temporary steel truss footbridge with closed cross-section
Popis výsledku anglicky
In this paper there is some particular information about the development of a new sort of a temporary modular steel footbridge for pedestrians and cyclist, which was designed as a truss system with the deck below the supports and with the closed cross-section. Actually, this development was connected to the research project, which was one of the several ones from the recent period, where they all were focused on temporary steel footbridges design, developing and testing (including full-scale testing) and which were realized on our workplace in cooperation with research centres and companies. In this case the new footbridge has a span 18 - 36 m and it is divided into 3.0 m long assembly units. They were selected some its details for the loading tests and finally it was performed also a test of the prototype. Therefore, this paper brings the results of those experiments as well as some particular conclusions.
Klasifikace
Druh
J<sub>SC</sub> - Článek v periodiku v databázi SCOPUS
CEP obor
—
OECD FORD obor
20102 - Construction engineering, Municipal and structural engineering
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
International Journal of Mechanics
ISSN
1998-4448
e-ISSN
—
Svazek periodika
9
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
US - Spojené státy americké
Počet stran výsledku
8
Strana od-do
173-180
Kód UT WoS článku
—
EID výsledku v databázi Scopus
2-s2.0-84926465272