Analysis of Load of the Tunnel Definitive Lining due to Vibrations of Various Sources
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F14%3A86091500" target="_blank" >RIV/61989100:27120/14:86091500 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.4028/www.scientific.net/AMR.1020.429" target="_blank" >http://dx.doi.org/10.4028/www.scientific.net/AMR.1020.429</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.4028/www.scientific.net/AMR.1020.429" target="_blank" >10.4028/www.scientific.net/AMR.1020.429</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Analysis of Load of the Tunnel Definitive Lining due to Vibrations of Various Sources
Popis výsledku v původním jazyce
The development of railways brought a great era of tunnel construction in the 19th century. One of the greatest obstacles for the railway between Bohumín and Žilina was the Jablunkov Pass. In 1869 the excavation of the first Jablunkov Tunnel started. In1914 the second one came. However in the era of modern railway corridors these tunnels are no longer satisfactory, so a process of their modernisation was launched. Eventually the second tunnel was re-bored as a two-track tunnel. In 2007 the constructionstarted, but in 2009 an exceptional event occurred, which significantly delayed the whole construction work. During the subsequent clearing of the cave-in a part of the tunnel from the northern portal remained in its definitive lining. Another part wastemporarily secured with a concrete plug, while the original primary lining was reinforced with a railway bridge pier (PIŽMO). To get through the caved-in section and the concrete plug it was necessary to deploy blasting too. This created
Název v anglickém jazyce
Analysis of Load of the Tunnel Definitive Lining due to Vibrations of Various Sources
Popis výsledku anglicky
The development of railways brought a great era of tunnel construction in the 19th century. One of the greatest obstacles for the railway between Bohumín and Žilina was the Jablunkov Pass. In 1869 the excavation of the first Jablunkov Tunnel started. In1914 the second one came. However in the era of modern railway corridors these tunnels are no longer satisfactory, so a process of their modernisation was launched. Eventually the second tunnel was re-bored as a two-track tunnel. In 2007 the constructionstarted, but in 2009 an exceptional event occurred, which significantly delayed the whole construction work. During the subsequent clearing of the cave-in a part of the tunnel from the northern portal remained in its definitive lining. Another part wastemporarily secured with a concrete plug, while the original primary lining was reinforced with a railway bridge pier (PIŽMO). To get through the caved-in section and the concrete plug it was necessary to deploy blasting too. This created
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/TE01020168" target="_blank" >TE01020168: Centrum pro efektivní a udržitelnou dopravní infrastrukturu (CESTI)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Advanced Materials Research. Volume 1020
ISBN
978-3-03835-237-2
ISSN
1022-6680
e-ISSN
—
Počet stran výsledku
6
Strana od-do
429-434
Název nakladatele
Trans Tech Publication Ltd
Místo vydání
Zürich
Místo konání akce
Ostrava
Datum konání akce
24. 6. 2014
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—