JIT single machine scheduling problem with periodic preventive maintenance
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27510%2F16%3A10240763" target="_blank" >RIV/61989100:27510/16:10240763 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.1007/s40092-016-0147-9" target="_blank" >https://doi.org/10.1007/s40092-016-0147-9</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/s40092-016-0147-9" target="_blank" >10.1007/s40092-016-0147-9</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
JIT single machine scheduling problem with periodic preventive maintenance
Popis výsledku v původním jazyce
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms. (C) 2016, The Author(s).
Název v anglickém jazyce
JIT single machine scheduling problem with periodic preventive maintenance
Popis výsledku anglicky
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms. (C) 2016, The Author(s).
Klasifikace
Druh
J<sub>SC</sub> - Článek v periodiku v databázi SCOPUS
CEP obor
—
OECD FORD obor
50204 - Business and management
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Journal of industrial engineering international
ISSN
1735-5702
e-ISSN
—
Svazek periodika
12
Číslo periodika v rámci svazku
3
Stát vydavatele periodika
US - Spojené státy americké
Počet stran výsledku
12
Strana od-do
299-310
Kód UT WoS článku
—
EID výsledku v databázi Scopus
2-s2.0-84979658622